ITAC Assessment: WV0625
ITAC logo
ITAC Assessment: WV0625
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Outdoor Sporting Goods Distribution
NAICS 493110: General Warehousing and Storage
SIC 4225: General Warehousing and Storage
Sales Range $50
M
to 100
M
# of Employees 425
Plant Area 1,167,604
ft2
Annual Production 20,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $316,606 5,685,300
kWh
Electricity Demand $155,222 9,379
kW-mo/yr
Electricity Fees $2,388 -
Natural Gas $54,599 23,894
MMBtu
TOTAL YEARLY COSTS $528,815
RECOMMENDED SAVINGS* $129,124 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,521

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $73,145 $29,680 $51,978
933,169
kWh
$21,167
-
kW-mo/yr
- -
02 2.7232: Replace existing hvac unit with high efficiency model $28,641 $112,444 $(-6,489.0)
(-116,492)
kWh
$(-2,648.0)
-
kW-mo/yr
$37,778
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,687 $17,469 $7,523
135,067
kWh
$5,164
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,879 $893 $4,893
87,843
kWh
$1,986
-
kW-mo/yr
- -
05 2.4224: Upgrade controls on compressors $3,011 $6,065 $2,035
36,543
kWh
$976
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $1,547 $2,323 $485
8,703
kWh
$199
-
kW-mo/yr
$863
-
MMBtu
-
07 2.2515: Use optimum thickness insulation $1,264 $5,280 - - $1,264
-
MMBtu
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $997 $120 $716
12,860
kWh
$281
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $734 $323 $519
9,317
kWh
$215
-
kW-mo/yr
- -
10 2.4151: Develop a repair/replace policy $219 $1,027 $287
5,144
kWh
$116
-
kW-mo/yr
- $(-184.0)
TOTAL RECOMMENDED $129,124 $175,624 $61,947
1,112,154
kWh
$27,456
-
kW-mo/yr
$39,905
-
MMBtu
$(-184.0)
TOTAL IMPLEMENTED $83,521 $34,366 $58,878
1,057,036
kWh
$23,964
-
kW-mo/yr
$863
-
MMBtu
$(-184.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs