Assessment Year | 2022 |
---|---|
Principal Product | Metal parts |
NAICS | 332710: Machine Shops |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 80 |
Plant Area |
50,451
ft2
|
Annual Production | 26,000
pieces
|
Production Hrs. Annual | 5,226
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,883 | 908,534 |
kWh
|
$0.066 |
Electricity Demand | $32,821 | 3,111 |
kW-mo/yr
|
$10.55 |
Electricity Fees | $2,100 | - |
|
- |
Natural Gas | $19,493 | 2,442 |
MMBtu
|
$7.98 |
TOTAL YEARLY COSTS | $114,297 | |||
RECOMMENDED SAVINGS* | $31,738 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,264 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,096 | $10,131 |
$16,336
237,787
kWh
|
$5,760
-
kW-mo/yr
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,969 | $4,600 | - |
$4,969
-
kW-mo/yr
|
- | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,452 | $1,125 |
$1,072
15,600
kWh
|
$380
-
kW-mo/yr
|
- | |
04 | 2.4224: Upgrade controls on compressors | $1,409 | $3,970 |
$1,029
14,972
kWh
|
$380
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,089 | $525 |
$804
11,696
kWh
|
$285
-
kW-mo/yr
|
- | |
06 | 2.4151: Develop a repair/replace policy | $369 | $1,670 |
$343
4,999
kWh
|
$116
-
kW-mo/yr
|
$(-90.0) | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $354 | $90 |
$259
3,769
kWh
|
$95
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $31,738 | $22,111 |
$19,843
288,823
kWh
|
$11,985
-
kW-mo/yr
|
$(-90.0) | ||
TOTAL IMPLEMENTED | $3,264 | $3,410 |
$2,478
36,064
kWh
|
$876
-
kW-mo/yr
|
$(-90.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs