ITAC Assessment: WV0618
ITAC logo
ITAC Assessment: WV0618
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Metal parts
NAICS 332710: Machine Shops
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area 50,451
ft2
Annual Production 26,000
pieces
Production Hrs. Annual 5,226
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,883 908,534
kWh
Electricity Demand $32,821 3,111
kW-mo/yr
Electricity Fees $2,100 -
Natural Gas $19,493 2,442
MMBtu
TOTAL YEARLY COSTS $114,297
RECOMMENDED SAVINGS* $31,738 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,264

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,096 $10,131 $16,336
237,787
kWh
$5,760
-
kW-mo/yr
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,969 $4,600 - $4,969
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $1,452 $1,125 $1,072
15,600
kWh
$380
-
kW-mo/yr
-
04 2.4224: Upgrade controls on compressors $1,409 $3,970 $1,029
14,972
kWh
$380
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,089 $525 $804
11,696
kWh
$285
-
kW-mo/yr
-
06 2.4151: Develop a repair/replace policy $369 $1,670 $343
4,999
kWh
$116
-
kW-mo/yr
$(-90.0)
07 2.4231: Reduce the pressure of compressed air to the minimum required $354 $90 $259
3,769
kWh
$95
-
kW-mo/yr
-
TOTAL RECOMMENDED $31,738 $22,111 $19,843
288,823
kWh
$11,985
-
kW-mo/yr
$(-90.0)
TOTAL IMPLEMENTED $3,264 $3,410 $2,478
36,064
kWh
$876
-
kW-mo/yr
$(-90.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs