ITAC Assessment: MUCM19
ITAC logo
ITAC Assessment: MUCM19
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Education
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 60
Plant Area 82,191
ft2
Annual Production 100
units
Production Hrs. Annual 3,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,959 554,940
kWh
Electricity Demand $29,124 1,673
kW-mo/yr
Electricity Fees $2,945 -
Natural Gas $21,797 5,667
MMBtu
Other Energy $9,527 1
MMBtu
TOTAL YEARLY COSTS $92,353
RECOMMENDED SAVINGS* $9,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $4,679 - $3,168
63,364
kWh
$1,511
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,108 $1,539 $1,429
28,580
kWh
$679
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $1,555 - $423
8,452
kWh
$1,132
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $663 - $449
8,977
kWh
$214
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $260 - $250
4,992
kWh
$10
-
kW-mo/yr
-
06 2.7444: Close holes and openings in building such as broken windows $49 $111 $9
186
kWh
$12
-
kW-mo/yr
$28
-
MMBtu
TOTAL RECOMMENDED $9,314 $1,650 $5,728
114,551
kWh
$3,558
-
kW-mo/yr
$28
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs