Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Metal Stamped Parts
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 54
Plant Area 65,079
ft2
Annual Production 28,000,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,567 1,396,438
kWh
Electricity Demand $72,460 6,868
kW-mo/yr
TOTAL YEARLY COSTS $175,027
RECOMMENDED SAVINGS* $24,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,898

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.7135: Install occupancy sensors $10,582 $19,059 $6,816
92,857
kWh
$3,766
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,162 $5,562 $3,326
45,317
kWh
$1,836
-
kW-mo/yr
- -
03 2.4224: Upgrade controls on compressors $2,975 $13,590 $2,099
28,590
kWh
$876
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,562 $209 $1,003
13,667
kWh
$559
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $973 $655 $625
8,515
kWh
$348
-
kW-mo/yr
- -
06 2.3212: Optimize plant power factor $811 $2,732 - - $811 -
07 2.4221: Install compressor air intakes in coolest locations $743 $2,460 $480
6,539
kWh
$263
-
kW-mo/yr
- -
08 2.4151: Develop a repair/replace policy $648 $2,086 $515
7,021
kWh
$285
-
kW-mo/yr
- $(-152.0)
09 2.4157: Establish a predictive maintenance program $454 $1,000 $1,099
14,977
kWh
$612
-
kW-mo/yr
- $(-1,257.0)
10 2.4239: Eliminate or reduce compressed air usage $450 $638 $292
3,972
kWh
$158
-
kW-mo/yr
- -
TOTAL RECOMMENDED $24,360 $47,991 $16,255
221,455
kWh
$8,703
-
kW-mo/yr
$811 $(-1,409.0)
TOTAL IMPLEMENTED $4,898 $7,320 $3,534
48,152
kWh
$1,962
-
kW-mo/yr
$811 $(-1,409.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs