ITAC Assessment: WV0616
ITAC logo
ITAC Assessment: WV0616
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Hand tools
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 40,450
ft2
Annual Production 25,000
units
Production Hrs. Annual 2,000
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,650 294,144
kWh
Electricity Demand $22,050 2,090
kW-mo/yr
Electricity Fees $2,846 -
Natural Gas $52,988 4,730
MMBtu
Waste Disposal Costs
Water Usage $886 56
Tgal
TOTAL YEARLY COSTS $103,420
RECOMMENDED SAVINGS* $20,729 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,324

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1133: Adjust burners for efficient operation $3,763 $7,400 - - $3,763
-
MMBtu
- -
02 2.4224: Upgrade controls on compressors $3,615 $9,369 $2,075
24,758
kWh
$1,540
-
kW-mo/yr
- - -
03 2.2511: Insulate bare equipment $2,901 $1,650 - - $2,901
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,796 $399 $1,593
19,008
kWh
$1,203
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $2,079 $2,877 $1,182
14,109
kWh
$897
-
kW-mo/yr
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,047 $4,500 - $2,047
-
kW-mo/yr
- - -
07 2.4239: Eliminate or reduce compressed air usage $1,963 $542 $1,119
13,350
kWh
$844
-
kW-mo/yr
- - -
08 2.1125: Convert to oxyfuel burners $980 $4,400 - - $14,829
-
MMBtu
- $(-13,849.0)
09 2.4239: Eliminate or reduce compressed air usage $412 $25 $233
2,778
kWh
$179
-
kW-mo/yr
- - -
10 2.4151: Develop a repair/replace policy $173 $594 $157
1,879
kWh
$116
-
kW-mo/yr
- $(-100.0) -
TOTAL RECOMMENDED $20,729 $31,756 $6,359
75,882
kWh
$6,826
-
kW-mo/yr
$21,493
-
MMBtu
$(-100.0) $(-13,849.0)
TOTAL IMPLEMENTED $10,324 $6,087 $4,284
51,124
kWh
$3,239
-
kW-mo/yr
$2,901
-
MMBtu
$(-100.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs