Assessment Year | 2008 |
---|---|
Principal Product | Pharmaceuticals |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $100 M to 500M |
# of Employees | 375 |
Plant Area |
225,000
ft2
|
Annual Production | 900,000,000
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,171,865 | 19,067,233 |
kWh
|
$0.061 |
Electricity Demand | $400,152 | 32,151 |
kW-mo/yr
|
$12.45 |
Natural Gas | $902,110 | 89,346 |
MMBtu
|
$10.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $140,143 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,229 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $38,137 | $280 | - | - | - |
$38,137
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $24,959 | $7,500 | - | - | - |
$24,959
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $43,147 | $30,570 |
$31,111
596,913
kWh
|
$11,398
-
kW-mo/yr
|
$638 | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,965 | $34,830 |
$17,699
339,595
kWh
|
- | $266 | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,037 | $389 |
$6,932
133,029
kWh
|
- | $105 | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,045 | $8,725 |
$4,357
83,596
kWh
|
$1,599
-
kW-mo/yr
|
$89 | - | |
07 | 2.7135: Install occupancy sensors | $1,338 | $13,840 |
$1,318
25,290
kWh
|
- | $20 | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,515 | $476 |
$927
17,792
kWh
|
$566
-
kW-mo/yr
|
$22 | - | |
TOTAL RECOMMENDED | $140,143 | $96,610 |
$62,344
1,196,215
kWh
|
$13,563
-
kW-mo/yr
|
$1,140 |
$63,096
-
MMBtu
|
||
TOTAL IMPLEMENTED | $56,229 | $39,684 |
$42,400
813,538
kWh
|
$12,997
-
kW-mo/yr
|
$832 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs