ITAC Assessment: MO0283
ITAC logo
ITAC Assessment: MO0283
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Chemicals
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 70,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 2,040
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,825 4,898,300
kWh
Electricity Demand $19,979 830
kW-mo/yr
Electricity Fees $30,603 -
Natural Gas $287,091 89,180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,722

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,608 $3,457 $1,488
28,722
kWh
$120
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $9,212 $8,200 $8,562
165,299
kWh
$650
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $594 $122 $546
10,551
kWh
$48
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $373 $40 $349
6,741
kWh
$24
-
kW-mo/yr
- -
05 3.7198: Reduce / eliminate use of disposable product $460 $900 - - $460
-
lb
-
06 4.111: Add equipment/ operators to reduce production bottleneck $9,720 - - - - $9,720
07 4.611: Begin a practice of predictive / preventative maintenance $9,128 $3,700 - - - $9,128
TOTAL RECOMMENDED $31,095 $16,419 $10,945
211,313
kWh
$842
-
kW-mo/yr
$460
-
lb
$18,848
TOTAL IMPLEMENTED $30,722 $16,379 $10,596
204,572
kWh
$818
-
kW-mo/yr
$460
-
lb
$18,848
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs