ITAC Assessment: WV0611
ITAC logo
ITAC Assessment: WV0611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Solid Recovered Fuel
NAICS 562920: Materials Recovery Facilities
SIC 4953: Refuse Systems
Sales Range $1
M
to 5
M
# of Employees 5
Plant Area 56,000
ft2
Annual Production 62,290
ton
Production Hrs. Annual 4,680
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,802 2,590,689
kWh
Electricity Demand $171,265 10,614
kW-mo/yr
Electricity Fees $41,829 -
TOTAL YEARLY COSTS $300,896
RECOMMENDED SAVINGS* $10,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,368

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.6218: Turn off equipment when not in use $2,448 $734 $1,480
43,656
kWh
$968
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,923 $240 $858
25,319
kWh
$1,065
-
kW-mo/yr
-
03 2.4157: Establish a predictive maintenance program $1,803 $3,254 $1,260
37,162
kWh
$1,243
-
kW-mo/yr
$(-700.0)
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,767 $2,029 $799
23,570
kWh
$968
-
kW-mo/yr
-
05 2.4151: Develop a repair/replace policy $1,003 $761 $622
18,341
kWh
$613
-
kW-mo/yr
$(-232.0)
06 2.7241: Install outside air damper / economizer on hvac unit $830 $4,080 $669
19,730
kWh
$161
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $244 $1,213 $148
4,350
kWh
$96
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $191 $29 $110
3,228
kWh
$81
-
kW-mo/yr
-
TOTAL RECOMMENDED $10,209 $12,340 $5,946
175,356
kWh
$5,195
-
kW-mo/yr
$(-932.0)
TOTAL IMPLEMENTED $7,368 $5,018 $4,330
127,706
kWh
$3,970
-
kW-mo/yr
$(-932.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs