Assessment Year | 2021 |
---|---|
Principal Product | Solid Recovered Fuel |
NAICS | 562920: Materials Recovery Facilities |
SIC | 4953: Refuse Systems |
Sales Range | $1 M to 5M |
# of Employees | 5 |
Plant Area |
56,000
ft2
|
Annual Production | 62,290
ton
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,802 | 2,590,689 |
kWh
|
$0.034 |
Electricity Demand | $171,265 | 10,614 |
kW-mo/yr
|
$16.14 |
Electricity Fees | $41,829 | - |
|
- |
TOTAL YEARLY COSTS | $300,896 | |||
RECOMMENDED SAVINGS* | $10,209 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,368 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $2,448 | $734 |
$1,480
43,656
kWh
|
$968
-
kW-mo/yr
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,923 | $240 |
$858
25,319
kWh
|
$1,065
-
kW-mo/yr
|
- | |
03 | 2.4157: Establish a predictive maintenance program | $1,803 | $3,254 |
$1,260
37,162
kWh
|
$1,243
-
kW-mo/yr
|
$(-700.0) | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,767 | $2,029 |
$799
23,570
kWh
|
$968
-
kW-mo/yr
|
- | |
05 | 2.4151: Develop a repair/replace policy | $1,003 | $761 |
$622
18,341
kWh
|
$613
-
kW-mo/yr
|
$(-232.0) | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $830 | $4,080 |
$669
19,730
kWh
|
$161
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $244 | $1,213 |
$148
4,350
kWh
|
$96
-
kW-mo/yr
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $191 | $29 |
$110
3,228
kWh
|
$81
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $10,209 | $12,340 |
$5,946
175,356
kWh
|
$5,195
-
kW-mo/yr
|
$(-932.0) | ||
TOTAL IMPLEMENTED | $7,368 | $5,018 |
$4,330
127,706
kWh
|
$3,970
-
kW-mo/yr
|
$(-932.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs