ITAC Assessment: WV0610
ITAC logo
ITAC Assessment: WV0610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Processed Coffee Beans
NAICS 311920: Coffee and Tea Manufacturing
SIC 2095: Roasted Coffee
Sales Range $10
M
to 50
M
# of Employees 23
Plant Area 116,000
ft2
Annual Production 7,690
ton
Production Hrs. Annual 4,160
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $462,900 5,439,382
kWh
Electricity Demand $57,219 10,823
kW-mo/yr
Electricity Fees $60,054 -
Natural Gas $134,406 40,605
MMBtu
Waste Disposal Costs
Water Usage $17,751 1,736
Tgal
TOTAL YEARLY COSTS $732,330
RECOMMENDED SAVINGS* $96,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,464

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $25,994 $14,525 $21,841
256,645
kWh
$4,153
-
kW-mo/yr
- - -
02 2.4224: Upgrade controls on compressors $23,895 $37,803 $21,885
257,166
kWh
$2,010
-
kW-mo/yr
- - -
03 2.2425: Use flue gases to heat process or service water $12,856 $33,120 $(-225.0)
(-2,648)
kWh
- $13,081
-
MMBtu
- -
04 2.8118: Check for accuracy of utility / power meters $5,861 $600 - - - $5,861
-
Tgal
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,437 $2,340 $5,010
58,872
kWh
$427
-
kW-mo/yr
- - -
06 2.4157: Establish a predictive maintenance program $4,869 $3,900 $4,722
55,481
kWh
$847
-
kW-mo/yr
- - $(-700.0)
07 2.4221: Install compressor air intakes in coolest locations $4,772 $4,186 $4,397
51,665
kWh
$375
-
kW-mo/yr
- - -
08 2.1221: Replace obsolete burners with more efficient ones $4,217 $19,800 - - $4,217
-
MMBtu
- -
09 2.1233: Analyze flue gas for proper air/fuel ratio $2,674 $1,700 - - $3,274
-
MMBtu
- $(-600.0)
10 2.4231: Reduce the pressure of compressed air to the minimum required $2,654 $100 $2,448
28,766
kWh
$206
-
kW-mo/yr
- - -
11 2.4151: Develop a repair/replace policy $2,566 $733 $2,580
30,323
kWh
$386
-
kW-mo/yr
- - $(-400.0)
12 2.2511: Insulate bare equipment $409 $488 - - $409
-
MMBtu
- -
TOTAL RECOMMENDED $96,204 $119,295 $62,658
736,270
kWh
$8,404
-
kW-mo/yr
$20,981
-
MMBtu
$5,861
-
Tgal
$(-1,700.0)
TOTAL IMPLEMENTED $50,464 $24,386 $36,601
430,087
kWh
$6,019
-
kW-mo/yr
$3,683
-
MMBtu
$5,861
-
Tgal
$(-1,700.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs