Assessment Year | 2021 |
---|---|
Principal Product | Processed Coffee Beans |
NAICS | 311920: Coffee and Tea Manufacturing |
SIC | 2095: Roasted Coffee |
Sales Range | $10 M to 50M |
# of Employees | 23 |
Plant Area |
116,000
ft2
|
Annual Production | 7,690
ton
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $462,900 | 5,439,382 |
kWh
|
$0.085 | |
Electricity Demand | $57,219 | 10,823 |
kW-mo/yr
|
$5.29 | |
Electricity Fees | $60,054 | - |
|
- | |
Natural Gas | $134,406 | 40,605 |
MMBtu
|
$3.31 | |
Waste Disposal Costs | |||||
Water Usage | $17,751 | 1,736 |
Tgal
|
$10.23 | |
TOTAL YEARLY COSTS | $732,330 | ||||
RECOMMENDED SAVINGS* | $96,204 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $50,464 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,994 | $14,525 |
$21,841
256,645
kWh
|
$4,153
-
kW-mo/yr
|
- | - | - | |
02 | 2.4224: Upgrade controls on compressors | $23,895 | $37,803 |
$21,885
257,166
kWh
|
$2,010
-
kW-mo/yr
|
- | - | - | |
03 | 2.2425: Use flue gases to heat process or service water | $12,856 | $33,120 |
$(-225.0)
(-2,648)
kWh
|
- |
$13,081
-
MMBtu
|
- | - | |
04 | 2.8118: Check for accuracy of utility / power meters | $5,861 | $600 | - | - | - |
$5,861
-
Tgal
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,437 | $2,340 |
$5,010
58,872
kWh
|
$427
-
kW-mo/yr
|
- | - | - | |
06 | 2.4157: Establish a predictive maintenance program | $4,869 | $3,900 |
$4,722
55,481
kWh
|
$847
-
kW-mo/yr
|
- | - | $(-700.0) | |
07 | 2.4221: Install compressor air intakes in coolest locations | $4,772 | $4,186 |
$4,397
51,665
kWh
|
$375
-
kW-mo/yr
|
- | - | - | |
08 | 2.1221: Replace obsolete burners with more efficient ones | $4,217 | $19,800 | - | - |
$4,217
-
MMBtu
|
- | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,674 | $1,700 | - | - |
$3,274
-
MMBtu
|
- | $(-600.0) | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,654 | $100 |
$2,448
28,766
kWh
|
$206
-
kW-mo/yr
|
- | - | - | |
11 | 2.4151: Develop a repair/replace policy | $2,566 | $733 |
$2,580
30,323
kWh
|
$386
-
kW-mo/yr
|
- | - | $(-400.0) | |
12 | 2.2511: Insulate bare equipment | $409 | $488 | - | - |
$409
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $96,204 | $119,295 |
$62,658
736,270
kWh
|
$8,404
-
kW-mo/yr
|
$20,981
-
MMBtu
|
$5,861
-
Tgal
|
$(-1,700.0) | ||
TOTAL IMPLEMENTED | $50,464 | $24,386 |
$36,601
430,087
kWh
|
$6,019
-
kW-mo/yr
|
$3,683
-
MMBtu
|
$5,861
-
Tgal
|
$(-1,700.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs