| Assessment Year | 2010 |
|---|---|
| Principal Product | Plastic Containers |
| NAICS | 326160: Plastics Bottle Manufacturing |
| SIC | 3085: Plastics Bottles |
| Sales Range | $10 M to 50M |
| # of Employees | 53 |
| Plant Area |
200,000
ft2
|
| Annual Production | 32,000,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $449,782 | 7,799,280 |
kWh
|
$0.058 |
| Natural Gas | $45,685 | 4,154 |
MMBtu
|
$11.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $52,576 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,607 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,353 | - |
$6,353
105,706
kWh
|
- | - | |
| 02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $10,144 | $4,600 |
$10,744
178,767
kWh
|
- | $(-600.0) | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,825 | $19,768 |
$19,825
329,874
kWh
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $3,777 | $10,640 |
$3,777
62,842
kWh
|
- | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $816 | $4,400 |
$816
13,574
kWh
|
- | - | |
| 06 | 2.7241: Install outside air damper / economizer on hvac unit | $11,661 | $775 |
$973
15,133
kWh
|
$10,688
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $52,576 | $40,183 |
$42,488
705,896
kWh
|
$10,688
-
MMBtu
|
$(-600.0) | ||
| TOTAL IMPLEMENTED | $22,607 | $15,815 |
$11,919
197,255
kWh
|
$10,688
-
MMBtu
|
- | ||