ITAC Assessment: HO0015
ITAC logo
ITAC Assessment: HO0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product REINFORCED PLASTIC PRODUCTSS
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 350
pieces
Production Hrs. Annual 5,100
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,456 977,726
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,323 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $926 $2,367 $1,570
12,016
kWh
- $(-644.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,577 $220 $1,577
12,016
kWh
- -
03 2.4133: Use most efficient type of electric motors $569 $220 $569
4,396
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,732 $1,200 $2,162
16,413
kWh
$(-430.0)
-
MMBtu
-
05 2.2511: Insulate bare equipment $597 $183 $597
4,689
kWh
- -
06 2.7314: Reduce ventilation air $8,676 $4,850 - $8,676
-
MMBtu
-
07 2.7494: Install storm windows and doors $246 $212 - $246
-
MMBtu
-
TOTAL RECOMMENDED $14,323 $9,252 $6,475
49,530
kWh
$8,492
-
MMBtu
$(-644.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs