Assessment Year | 2015 |
---|---|
Principal Product | Dump Truck bodies |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | $50 M to 100M |
# of Employees | 232 |
Plant Area |
300,000
ft2
|
Annual Production | 13,960,454
lb
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $110,982 | 3,045,000 |
kWh
|
$0.036 |
Electricity Demand | $130,487 | 8,076 |
kW-mo/yr
|
$16.16 |
Electricity Fees | $8,494 | - |
|
- |
Natural Gas | $195,810 | 40,711 |
MMBtu
|
$4.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,696 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $40,278 | $52,119 |
$17,802
489,091
kWh
|
$22,476
-
kW-mo/yr
|
- | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $5,430 | $24,985 |
$5,430
149,189
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,837 | $4,537 |
$888
24,404
kWh
|
$949
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,232 | $328 |
$1,558
42,727
kWh
|
$1,674
-
kW-mo/yr
|
- | - | |
05 | 2.4112: Install soft-start to eliminate nuisance trips | $1,629 | $5,844 |
$138
3,799
kWh
|
$149
-
kW-mo/yr
|
- | $1,342 | |
06 | 2.7135: Install occupancy sensors | $1,556 | $4,313 |
$1,556
42,706
kWh
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,344 | $35 |
$647
17,784
kWh
|
$697
-
kW-mo/yr
|
- | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $905 | $500 |
$169
4,693
kWh
|
$736
-
kW-mo/yr
|
- | - | |
09 | 2.1213: Direct warmest air to combustion intake | $485 | $180 | - | - |
$485
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $56,696 | $92,841 |
$28,188
774,393
kWh
|
$26,681
-
kW-mo/yr
|
$485
-
MMBtu
|
$1,342 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs