ITAC Assessment: IA0542
ITAC logo
ITAC Assessment: IA0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Dump Truck bodies
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $50
M
to 100
M
# of Employees 232
Plant Area 300,000
ft2
Annual Production 13,960,454
lb
Production Hrs. Annual 4,940
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,982 3,045,000
kWh
Electricity Demand $130,487 8,076
kW-mo/yr
Electricity Fees $8,494 -
Natural Gas $195,810 40,711
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $40,278 $52,119 $17,802
489,091
kWh
$22,476
-
kW-mo/yr
- -
02 2.4322: Use or replace with energy efficient substitutes $5,430 $24,985 $5,430
149,189
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,837 $4,537 $888
24,404
kWh
$949
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,232 $328 $1,558
42,727
kWh
$1,674
-
kW-mo/yr
- -
05 2.4112: Install soft-start to eliminate nuisance trips $1,629 $5,844 $138
3,799
kWh
$149
-
kW-mo/yr
- $1,342
06 2.7135: Install occupancy sensors $1,556 $4,313 $1,556
42,706
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,344 $35 $647
17,784
kWh
$697
-
kW-mo/yr
- -
08 2.4239: Eliminate or reduce compressed air usage $905 $500 $169
4,693
kWh
$736
-
kW-mo/yr
- -
09 2.1213: Direct warmest air to combustion intake $485 $180 - - $485
-
MMBtu
-
TOTAL RECOMMENDED $56,696 $92,841 $28,188
774,393
kWh
$26,681
-
kW-mo/yr
$485
-
MMBtu
$1,342
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs