Assessment Year | 2021 |
---|---|
Principal Product | Engines, Transmissions and Axles |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
1,500,000
ft2
|
Annual Production | 80,000
units
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,478,640 | 48,031,972 |
kWh
|
$0.031 |
Electricity Demand | $520,850 | 60,780 |
kW-mo/yr
|
$8.57 |
Electricity Fees | $28,722 | - |
|
- |
Natural Gas | $554,936 | 100,324 |
MMBtu
|
$5.53 |
TOTAL YEARLY COSTS | $2,583,148 | |||
RECOMMENDED SAVINGS* | $124,837 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,471 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $78,485 | $318,088 |
$54,240
1,761,049
kWh
|
$24,245
-
kW-mo/yr
|
- | - | |
02 | 2.1221: Replace obsolete burners with more efficient ones | $13,040 | $40,560 | - | - | - |
$13,040
-
MMBtu
|
|
03 | 2.3212: Optimize plant power factor | $9,397 | $42,210 | - | - | $9,397 | - | |
04 | 2.4224: Upgrade controls on compressors | $5,784 | $14,420 |
$3,564
115,728
kWh
|
$2,220
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $3,695 | $3,480 |
$2,357
76,511
kWh
|
$1,338
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,657 | $140 |
$2,646
85,886
kWh
|
$1,011
-
kW-mo/yr
|
- | - | |
07 | 2.4151: Develop a repair/replace policy | $3,040 | $809 |
$2,297
74,588
kWh
|
$1,303
-
kW-mo/yr
|
$(-560.0) | - | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $2,444 | $7,620 |
$(-67.0)
(-2,172)
kWh
|
- | - |
$2,511
-
MMBtu
|
|
09 | 2.4157: Establish a predictive maintenance program | $2,405 | $1,500 |
$2,641
85,733
kWh
|
$1,500
-
kW-mo/yr
|
$(-1,736.0) | - | |
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,211 | $3,175 | - | - | - |
$1,211
-
MMBtu
|
|
11 | 2.2511: Insulate bare equipment | $1,192 | $1,293 | - | - | - |
$1,192
-
MMBtu
|
|
12 | 2.4231: Reduce the pressure of compressed air to the minimum required | $487 | $1,350 |
$487
15,803
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $124,837 | $434,645 |
$68,165
2,213,126
kWh
|
$31,617
-
kW-mo/yr
|
$7,101 |
$17,954
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,471 | $26,167 |
$13,992
454,249
kWh
|
$7,372
-
kW-mo/yr
|
$(-2,296.0) |
$2,403
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs