Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Fabricated Metal Products
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 55,000
ft2
Annual Production 4,000
ton
Production Hrs. Annual 3,978
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,220 1,159,718
kWh
Electricity Demand $54,283 3,247
kW-mo/yr
Electricity Fees $5,203 -
Natural Gas $3,952 517
MMBtu
TOTAL YEARLY COSTS $105,658
RECOMMENDED SAVINGS* $25,928 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.4224: Upgrade controls on compressors $14,736 $14,181 $8,830
242,587
kWh
$5,906
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,236 $13,076 $1,942
53,359
kWh
$3,294
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $3,155 $2,492 - - - $3,155
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,519 $50 $934
25,669
kWh
$585
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $635 $1,054 $635
17,446
kWh
- - - -
06 2.4151: Develop a repair/replace policy $326 $358 $308
8,451
kWh
$418
-
kW-mo/yr
- - $(-400.0)
07 2.3212: Optimize plant power factor $321 $1,410 - - $321 - -
TOTAL RECOMMENDED $25,928 $32,621 $12,649
347,512
kWh
$10,203
-
kW-mo/yr
$321 $3,155
-
MMBtu
$(-400.0)
TOTAL IMPLEMENTED $2,480 $1,462 $1,877
51,566
kWh
$1,003
-
kW-mo/yr
- - $(-400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs