Assessment Year | 2021 |
---|---|
Principal Product | Fabricated Metal Products |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
55,000
ft2
|
Annual Production | 4,000
ton
|
Production Hrs. Annual | 3,978
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $42,220 | 1,159,718 |
kWh
|
$0.036 |
Electricity Demand | $54,283 | 3,247 |
kW-mo/yr
|
$16.72 |
Electricity Fees | $5,203 | - |
|
- |
Natural Gas | $3,952 | 517 |
MMBtu
|
$7.64 |
TOTAL YEARLY COSTS | $105,658 | |||
RECOMMENDED SAVINGS* | $25,928 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,480 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $14,736 | $14,181 |
$8,830
242,587
kWh
|
$5,906
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,236 | $13,076 |
$1,942
53,359
kWh
|
$3,294
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $3,155 | $2,492 | - | - | - |
$3,155
-
MMBtu
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,519 | $50 |
$934
25,669
kWh
|
$585
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $635 | $1,054 |
$635
17,446
kWh
|
- | - | - | - | |
06 | 2.4151: Develop a repair/replace policy | $326 | $358 |
$308
8,451
kWh
|
$418
-
kW-mo/yr
|
- | - | $(-400.0) | |
07 | 2.3212: Optimize plant power factor | $321 | $1,410 | - | - | $321 | - | - | |
TOTAL RECOMMENDED | $25,928 | $32,621 |
$12,649
347,512
kWh
|
$10,203
-
kW-mo/yr
|
$321 |
$3,155
-
MMBtu
|
$(-400.0) | ||
TOTAL IMPLEMENTED | $2,480 | $1,462 |
$1,877
51,566
kWh
|
$1,003
-
kW-mo/yr
|
- | - | $(-400.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs