| Assessment Year | 2021 |
|---|---|
| Principal Product | Plastic prodcuts |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 88 |
| Plant Area |
565,000
ft2
|
| Annual Production | 4,657
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | West Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $773,326 | 14,197,293 |
kWh
|
$0.054 |
| Electricity Demand | $207,594 | 15,932 |
kW-mo/yr
|
$13.03 |
| Electricity Fees | $480 | - |
|
- |
| TOTAL YEARLY COSTS | $981,400 | |||
| RECOMMENDED SAVINGS* | $199,765 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,934 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $173,936 | $85,154 |
$131,028
2,404,177
kWh
|
$42,908
-
kW-mo/yr
|
- | |
| 02 | 2.4224: Upgrade controls on compressors | $9,895 | $1,511 |
$7,456
136,816
kWh
|
$2,439
-
kW-mo/yr
|
- | |
| 03 | 2.4151: Develop a repair/replace policy | $7,177 | $729 |
$6,009
110,255
kWh
|
$1,968
-
kW-mo/yr
|
$(-800.0) | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,685 | $50 |
$3,525
64,684
kWh
|
$1,160
-
kW-mo/yr
|
- | |
| 05 | 2.2511: Insulate bare equipment | $2,253 | $314 |
$1,693
31,058
kWh
|
$560
-
kW-mo/yr
|
- | |
| 06 | 2.7135: Install occupancy sensors | $1,819 | $595 |
$1,363
25,018
kWh
|
$456
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $199,765 | $88,353 |
$151,074
2,772,008
kWh
|
$49,491
-
kW-mo/yr
|
$(-800.0) | ||
| TOTAL IMPLEMENTED | $15,934 | $1,688 |
$12,590
231,015
kWh
|
$4,144
-
kW-mo/yr
|
$(-800.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs