ITAC Assessment: WV0606
ITAC logo
ITAC Assessment: WV0606
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Plastic prodcuts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area 565,000
ft2
Annual Production 4,657
ton
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $773,326 14,197,293
kWh
Electricity Demand $207,594 15,932
kW-mo/yr
Electricity Fees $480 -
TOTAL YEARLY COSTS $981,400
RECOMMENDED SAVINGS* $199,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,934

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $173,936 $85,154 $131,028
2,404,177
kWh
$42,908
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $9,895 $1,511 $7,456
136,816
kWh
$2,439
-
kW-mo/yr
-
03 2.4151: Develop a repair/replace policy $7,177 $729 $6,009
110,255
kWh
$1,968
-
kW-mo/yr
$(-800.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,685 $50 $3,525
64,684
kWh
$1,160
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $2,253 $314 $1,693
31,058
kWh
$560
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $1,819 $595 $1,363
25,018
kWh
$456
-
kW-mo/yr
-
TOTAL RECOMMENDED $199,765 $88,353 $151,074
2,772,008
kWh
$49,491
-
kW-mo/yr
$(-800.0)
TOTAL IMPLEMENTED $15,934 $1,688 $12,590
231,015
kWh
$4,144
-
kW-mo/yr
$(-800.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs