ITAC Assessment: LE0375
ITAC logo
ITAC Assessment: LE0375
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Laminated Windows and Window Frames
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 103,000
ft2
Annual Production 105,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,456 4,234,050
kWh
Electricity Demand $22,237 10,730
kW-mo/yr
Electricity Fees $38,069 -
Natural Gas $20,012 1,957
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $6,302 - - - - $6,302 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,973 $1,000 $11,083
158,331
kWh
$890
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $794 $450 $662
9,450
kWh
$132
-
kW-mo/yr
- - -
04 2.7261: Install timers and/or thermostats $2,600 $2,185 - - $2,600
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $439 $550 $375
5,350
kWh
$64
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,522 $9,700 $7,228
103,251
kWh
$294
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $7,827 $20,628 $6,547
93,533
kWh
$1,014
-
kW-mo/yr
- - $266
08 2.4225: Install common header on compressors $2,849 $10,313 $2,737
39,102
kWh
$112
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,142 $8,160 $1,386
19,802
kWh
$236
-
kW-mo/yr
- - $520
TOTAL RECOMMENDED $42,448 $52,986 $30,018
428,819
kWh
$2,742
-
kW-mo/yr
$2,600
-
MMBtu
$6,302 $786
TOTAL IMPLEMENTED - - - - - - -