ITAC Assessment: MO0096
ITAC logo
ITAC Assessment: MO0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Electric Motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 199
Plant Area 77,600
ft2
Annual Production 1,041,200
pieces
Production Hrs. Annual 4,410
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,400 2,448,124
kWh
Natural Gas $27,807 6,932
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,695 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,544 $100 $1,544
21,981
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,468 $1,101 $1,468
20,809
kWh
-
03 2.4314: Use synthetic lubricant $771 $384 $771
10,844
kWh
-
04 2.4133: Use most efficient type of electric motors $2,934 $6,517 $2,934
41,618
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $907 $380 $907
12,896
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,944 $6,284 $1,944
27,550
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $527 $92 $527
7,620
kWh
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $47,000 $15,247 - $47,000
-
MMBtu
09 2.8114: Change rate schedules or other changes in utility service $12,600 $11,525 $12,600
-
kWh
-
TOTAL RECOMMENDED $69,695 $41,630 $22,695
143,318
kWh
$47,000
-
MMBtu
TOTAL IMPLEMENTED $20,380 $25,899 $20,380
110,493
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs