| Assessment Year | 1993 |
|---|---|
| Principal Product | Electric Motors |
| NAICS |
n/a
|
| SIC | 3621: Motors and Generators |
| Sales Range | $10 M to 50M |
| # of Employees | 199 |
| Plant Area |
77,600
ft2
|
| Annual Production | 1,041,200
pieces
|
| Production Hrs. Annual | 4,410
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $177,400 | 2,448,124 |
kWh
|
$0.072 |
| Natural Gas | $27,807 | 6,932 |
MMBtu
|
$4.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $69,695 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,380 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,544 | $100 |
$1,544
21,981
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $1,468 | $1,101 |
$1,468
20,809
kWh
|
- | |
| 03 | 2.4314: Use synthetic lubricant | $771 | $384 |
$771
10,844
kWh
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $2,934 | $6,517 |
$2,934
41,618
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $907 | $380 |
$907
12,896
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,944 | $6,284 |
$1,944
27,550
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $527 | $92 |
$527
7,620
kWh
|
- | |
| 08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $47,000 | $15,247 | - |
$47,000
-
MMBtu
|
|
| 09 | 2.8114: Change rate schedules or other changes in utility service | $12,600 | $11,525 |
$12,600
-
kWh
|
- | |
| TOTAL RECOMMENDED | $69,695 | $41,630 |
$22,695
143,318
kWh
|
$47,000
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $20,380 | $25,899 |
$20,380
110,493
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs