ITAC Assessment: WV0605
ITAC logo
ITAC Assessment: WV0605
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Automotive Stamping
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 600
Plant Area 933,390
ft2
Annual Production 75,000
units
Production Hrs. Annual 7,488
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,284,677 39,240,000
kWh
Electricity Demand $1,247,064 76,836
kW-mo/yr
Electricity Fees $37,546 -
Natural Gas $363,020 107,657
MMBtu
Waste Disposal Costs
Water Usage $73,413 6,952
Tgal
Water Disposal $82,947 6,356
Tgal
TOTAL YEARLY COSTS $3,088,667
RECOMMENDED SAVINGS* $239,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,973

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.4224: Upgrade controls on compressors $59,363 $10,625 $33,973
1,038,917
kWh
$25,390
-
kW-mo/yr
- - - -
02 2.2424: Use heat in flue gases to preheat products or materials $37,902 $115,920 $(-1,831.0)
(-55,994)
kWh
$(-121.0)
-
kW-mo/yr
$39,854
-
MMBtu
- - -
03 3.4154: Eliminate leaks in water lines and valves $29,737 $10,000 - - - $14,365
-
Tgal
$17,372
-
Tgal
$(-2,000.0)
04 2.4221: Install compressor air intakes in coolest locations $20,502 $2,155 $11,561
353,570
kWh
$8,941
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $18,719 $125 $11,140
340,679
kWh
$7,579
-
kW-mo/yr
- - - -
06 2.4151: Develop a repair/replace policy $14,806 $683 $8,423
257,588
kWh
$6,703
-
kW-mo/yr
- - - $(-320.0)
07 2.1233: Analyze flue gas for proper air/fuel ratio $13,015 $4,100 - - $18,265
-
MMBtu
- - $(-5,250.0)
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,600 $1,326 $7,017
214,594
kWh
$5,583
-
kW-mo/yr
- - - -
09 2.4157: Establish a predictive maintenance program $10,833 $1,500 $7,487
228,967
kWh
$5,096
-
kW-mo/yr
- - - $(-1,750.0)
10 2.7135: Install occupancy sensors $8,864 $20,709 $4,936
150,958
kWh
$3,928
-
kW-mo/yr
- - - -
11 2.2511: Insulate bare equipment $6,929 $10,915 - - $6,929
-
MMBtu
- - -
12 2.7241: Install outside air damper / economizer on hvac unit $6,500 $30,000 $4,861
148,659
kWh
$1,639
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $239,770 $208,058 $87,567
2,677,938
kWh
$64,738
-
kW-mo/yr
$65,048
-
MMBtu
$14,365
-
Tgal
$17,372
-
Tgal
$(-9,320.0)
TOTAL IMPLEMENTED $69,973 $7,734 $34,067
1,041,828
kWh
$24,961
-
kW-mo/yr
$18,265
-
MMBtu
- - $(-7,320.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs