Assessment Year | 2021 |
---|---|
Principal Product | Release Agents and Icing Stabilizers |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 66 |
Plant Area |
83,500
ft2
|
Annual Production | 60,000,000
lb
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $55,011 | 1,586,882 |
kWh
|
$0.035 |
Electricity Demand | $76,286 | 6,954 |
kW-mo/yr
|
$10.97 |
Electricity Fees | $1,585 | - |
|
- |
Natural Gas | $137,263 | 20,705 |
MMBtu
|
$6.63 |
TOTAL YEARLY COSTS | $270,145 | |||
RECOMMENDED SAVINGS* | $14,328 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,051 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,049 | $3,000 | - | - |
$5,079
-
MMBtu
|
$(-30.0) | |
02 | 2.1213: Direct warmest air to combustion intake | $4,212 | $8,168 |
$(-708.0)
(-20,413)
kWh
|
- |
$4,920
-
MMBtu
|
- | |
03 | 2.7135: Install occupancy sensors | $1,669 | $2,886 |
$922
26,571
kWh
|
$747
-
kW-mo/yr
|
- | - | |
04 | 2.2511: Insulate bare equipment | $1,512 | $2,197 | - | - |
$1,512
-
MMBtu
|
- | |
05 | 2.4224: Upgrade controls on compressors | $743 | $1,348 |
$649
18,703
kWh
|
$94
-
kW-mo/yr
|
- | - | |
06 | 2.4224: Upgrade controls on compressors | $322 | $299 |
$322
9,271
kWh
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $268 | $1,225 |
$147
4,242
kWh
|
$121
-
kW-mo/yr
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $263 | $1,060 |
$142
4,097
kWh
|
$121
-
kW-mo/yr
|
- | - | |
09 | 2.4151: Develop a repair/replace policy | $154 | $568 |
$349
10,071
kWh
|
$285
-
kW-mo/yr
|
- | $(-480.0) | |
10 | 2.4157: Establish a predictive maintenance program | $136 | $570 |
$587
16,919
kWh
|
$472
-
kW-mo/yr
|
- | $(-923.0) | |
TOTAL RECOMMENDED | $14,328 | $21,321 |
$2,410
69,461
kWh
|
$1,840
-
kW-mo/yr
|
$11,511
-
MMBtu
|
$(-1,433.0) | ||
TOTAL IMPLEMENTED | $9,051 | $11,506 |
$2,147
61,900
kWh
|
$1,746
-
kW-mo/yr
|
$6,591
-
MMBtu
|
$(-1,433.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs