Assessment Year | 1999 |
---|---|
Principal Product | Fluorescent Fixtures |
NAICS |
n/a
|
SIC | 3351: Rolling, Drawing, and Extruding Of Copper |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
491,900
ft2
|
Annual Production | 2,750,000
pieces
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $325,322 | 12,232,708 |
kWh
|
$0.027 |
Electricity Demand | $251,365 | 20,920 |
kW-mo/yr
|
$12.02 |
Electricity Fees | $36,810 | - |
|
- |
Natural Gas | $191,141 | 45,008 |
MMBtu
|
$4.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,544,954 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,455,046 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1231: Establish burner maintenance schedule for boilers | $3,706 | - | - | - | - |
$4,606
-
MMBtu
|
- | - | - | $(-900.0) | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,660 | $1,150 |
$5,340
166,764
kWh
|
- | $320 | - | - | - | - | - | - | - | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $23,271 | $27,500 |
$12,512
390,973
kWh
|
$10,759
-
kW-mo/yr
|
- | - | - | - | - | - | - | - | - | |
04 | 2.7261: Install timers and/or thermostats | $678 | $1,000 |
$678
19,930
kWh
|
- | - | - | - | - | - | - | - | - | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $1,662 | $345 |
$757
23,740
kWh
|
$812
-
kW-mo/yr
|
$93 | - | - | - | - | - | - | - | - | |
06 | 3.6113: Remove sludge from tanks on a regular basis | $48,977 | $25,000 | - | - | - | - |
$22,727
-
gal
|
- | $3,750 | - | - | $22,500 | - | |
07 | 3.8314: Purchase high materials in returnable bulk containers | $12,000 | $5,000 | - | - | - | - | - |
$333
-
lb
|
- | - | $11,667 | - | - | |
08 | 4.625: Develop standard operating procedures | $1,449,000 | $234,000 | - | - | - | - | - | - | - | - | - | - | $1,449,000 | |
TOTAL RECOMMENDED | $1,544,954 | $293,995 |
$19,287
601,407
kWh
|
$11,571
-
kW-mo/yr
|
$413 |
$4,606
-
MMBtu
|
$22,727
-
gal
|
$333
-
lb
|
$3,750 | $(-900.0) | $11,667 | $22,500 | $1,449,000 | ||
TOTAL IMPLEMENTED | $1,455,046 | $235,345 |
$1,435
43,670
kWh
|
$812
-
kW-mo/yr
|
$93 |
$4,606
-
MMBtu
|
- | - | - | $(-900.0) | - | - | $1,449,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs