ITAC Assessment: WV0583
ITAC logo
ITAC Assessment: WV0583
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Decal graphics and signs
NAICS 339950: Sign Manufacturing
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 225,000
ft2
Annual Production 1,650,000
units
Production Hrs. Annual 6,000
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,856 3,461,552
kWh
Electricity Demand $216,908 14,058
kW-mo/yr
Electricity Fees $13,339 -
Other Gas $48,598 2,786
MMBtu
TOTAL YEARLY COSTS $436,701
RECOMMENDED SAVINGS* $50,887 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $26,290 $53,184 $15,382
337,316
kWh
$10,908
-
kW-mo/yr
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,666 $2,560 - $6,666
-
kW-mo/yr
03 2.7241: Install outside air damper / economizer on hvac unit $6,740 $4,320 $2,890
63,376
kWh
$3,850
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,446 $28 $2,057
45,105
kWh
$1,389
-
kW-mo/yr
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,448 - $1,460
32,022
kWh
$988
-
kW-mo/yr
06 2.4224: Upgrade controls on compressors $2,254 $5,905 $1,344
29,469
kWh
$910
-
kW-mo/yr
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,271 $607 $762
16,712
kWh
$509
-
kW-mo/yr
08 2.4151: Develop a repair/replace policy $1,265 $582 $756
16,579
kWh
$509
-
kW-mo/yr
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $507 $270 $306
6,714
kWh
$201
-
kW-mo/yr
TOTAL RECOMMENDED $50,887 $67,456 $24,957
547,293
kWh
$25,930
-
kW-mo/yr
TOTAL IMPLEMENTED $35,227 $54,671 $20,723
454,448
kWh
$14,504
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs