ITAC Assessment: WV0579
ITAC logo
ITAC Assessment: WV0579
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Paint and allied products
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 250,000
ft2
Annual Production 100,000,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,041 7,939,442
kWh
Electricity Demand $159,884 9,086
kW-mo/yr
Electricity Fees $108 -
Natural Gas $508,804 126,919
MMBtu
Waste Disposal Costs
Other Liquid (non-haz) $125,800 370,000
gal
TOTAL YEARLY COSTS $1,044,637
RECOMMENDED SAVINGS* $147,499 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,802

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $95,486 $76,000 $(-3,266.0)
(-103,697)
kWh
- $(-14,468.0)
-
MMBtu
$113,220
-
gal
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $18,379 $3,500 - - $18,867
-
MMBtu
- $(-488.0)
03 2.1221: Replace obsolete burners with more efficient ones $14,452 $10,325 - - $14,452
-
MMBtu
- -
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $8,774 $22,038 - - $8,774
-
MMBtu
- -
05 2.4151: Develop a repair/replace policy $4,488 $879 $1,510
47,931
kWh
$3,238
-
kW-mo/yr
- - $(-260.0)
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,976 $11,825 $2,976
94,484
kWh
- - - -
07 2.4224: Upgrade controls on compressors $1,120 $5,000 $275
8,745
kWh
$845
-
kW-mo/yr
- - -
08 2.4234: Cool compressor air intake with heat exchanger $889 $1,460 $393
12,476
kWh
$496
-
kW-mo/yr
- - -
09 2.4157: Establish a predictive maintenance program $589 $1,000 $4,026
127,816
kWh
$3,080
-
kW-mo/yr
- - $(-6,517.0)
10 2.4231: Reduce the pressure of compressed air to the minimum required $346 $33 $82
2,618
kWh
$264
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $147,499 $132,060 $5,996
190,373
kWh
$7,923
-
kW-mo/yr
$27,625
-
MMBtu
$113,220
-
gal
$(-7,265.0)
TOTAL IMPLEMENTED $23,802 $5,412 $5,618
178,365
kWh
$6,582
-
kW-mo/yr
$18,867
-
MMBtu
- $(-7,265.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs