ITAC Assessment: SD0129
ITAC logo
ITAC Assessment: SD0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product DC Plasma Displays, Relays, Power Supply Units
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 130,000
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 4,862
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $403,117 4,708,382
kWh
Natural Gas $18,730 2,844
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,064 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,064

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $2,033 $2,490 $2,033
26,671
kWh
02 2.7261: Install timers and/or thermostats $8,673 $2,200 $8,673
129,543
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,814 $19,129 $11,814
137,749
kWh
04 2.7144: Install spectral reflectors / delamp $27,054 $29,890 $27,054
346,131
kWh
05 2.7135: Install occupancy sensors $1,675 $2,002 $1,675
17,585
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $815 $980 $815
11,430
kWh
TOTAL RECOMMENDED $52,064 $56,691 $52,064
669,109
kWh
TOTAL IMPLEMENTED $52,064 $56,691 $52,064
669,109
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs