Assessment Year | 2005 |
---|---|
Principal Product | Silicone mouldings and hoses |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 66 |
Plant Area |
22,000
ft2
|
Annual Production | 363
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,578 | 1,783,200 |
kWh
|
$0.058 |
Electricity Demand | $67,192 | 6,078 |
kW-mo/yr
|
$11.05 |
Electricity Fees | $6,106 | - |
|
- |
Natural Gas | $17,399 | 1,297 |
MMBtu
|
$13.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,409 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,986 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1331: Burn a less expensive grade of fuel | $29,215 | $95,420 |
$31,900
550,080
kWh
|
$23,750
-
kW-mo/yr
|
$(-26,435.0)
-
MMBtu
|
|
02 | 2.2212: Use minimum safe oven ventilation | $13,600 | $1,600 |
$13,600
234,800
kWh
|
- | - | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,300 | $4,000 |
$3,300
57,300
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,608 | $10,890 |
$357
6,154
kWh
|
$2,251
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,311 | $3,565 |
$663
11,426
kWh
|
$297
-
kW-mo/yr
|
$1,351
-
MMBtu
|
|
06 | 2.2531: Re-size charging openings or add movable cover or door | $1,951 | $400 |
$1,951
33,650
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $2,060 | $1,800 |
$1,931
23,987
kWh
|
$714
-
kW-mo/yr
|
$(-585.0)
-
MMBtu
|
|
08 | 2.2511: Insulate bare equipment | $187 | $60 |
$63
1,085
kWh
|
$124
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $177 | $800 |
$110
1,900
kWh
|
$67
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $55,409 | $118,535 |
$53,875
920,382
kWh
|
$27,203
-
kW-mo/yr
|
$(-25,669.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,986 | $10,625 |
$8,018
129,348
kWh
|
$1,202
-
kW-mo/yr
|
$766
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs