ITAC Assessment: MA0589
ITAC logo
ITAC Assessment: MA0589
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Silicone mouldings and hoses
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 66
Plant Area 22,000
ft2
Annual Production 363
ton
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,578 1,783,200
kWh
Electricity Demand $67,192 6,078
kW-mo/yr
Electricity Fees $6,106 -
Natural Gas $17,399 1,297
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,409 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,986

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1331: Burn a less expensive grade of fuel $29,215 $95,420 $31,900
550,080
kWh
$23,750
-
kW-mo/yr
$(-26,435.0)
-
MMBtu
02 2.2212: Use minimum safe oven ventilation $13,600 $1,600 $13,600
234,800
kWh
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $3,300 $4,000 $3,300
57,300
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,608 $10,890 $357
6,154
kWh
$2,251
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,311 $3,565 $663
11,426
kWh
$297
-
kW-mo/yr
$1,351
-
MMBtu
06 2.2531: Re-size charging openings or add movable cover or door $1,951 $400 $1,951
33,650
kWh
- -
07 2.2511: Insulate bare equipment $2,060 $1,800 $1,931
23,987
kWh
$714
-
kW-mo/yr
$(-585.0)
-
MMBtu
08 2.2511: Insulate bare equipment $187 $60 $63
1,085
kWh
$124
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $177 $800 $110
1,900
kWh
$67
-
kW-mo/yr
-
TOTAL RECOMMENDED $55,409 $118,535 $53,875
920,382
kWh
$27,203
-
kW-mo/yr
$(-25,669.0)
-
MMBtu
TOTAL IMPLEMENTED $9,986 $10,625 $8,018
129,348
kWh
$1,202
-
kW-mo/yr
$766
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs