ITAC Assessment: WV0578
ITAC logo
ITAC Assessment: WV0578
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Thermoset plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 92,437
ft2
Annual Production 17,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $667,339 9,266,614
kWh
Electricity Demand $291,533 15,186
kW-mo/yr
Electricity Fees $1,200 -
Natural Gas $50,360 8,033
MMBtu
Waste Disposal Costs
Water Usage $8,415 962
Tgal
Water Disposal $674 33
Tgal
Other Liquid (non-haz) $12,000 12,000
gal
TOTAL YEARLY COSTS $1,031,521
RECOMMENDED SAVINGS* $95,745 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,964

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 2.2511: Insulate bare equipment $49,796 $9,417 $49,796
691,480
kWh
- - - - - -
02 2.4224: Upgrade controls on compressors $13,935 $4,000 $13,935
193,543
kWh
- - - - - -
03 2.3191: Use demand controller or load shedder $9,677 $17,920 - $9,677
-
kW-mo/yr
- - - - -
04 3.3131: Use evaporation to concentrate material $6,422 $11,000 $(-1,978.0)
(-27,466)
kWh
- - - - $8,400
-
gal
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $6,104 $3,500 - - $13,004
-
MMBtu
- - - $(-6,900.0)
06 2.4151: Develop a repair/replace policy $5,469 $692 $3,783
52,547
kWh
$2,054
-
kW-mo/yr
- - - - $(-368.0)
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,576 $3,000 $1,019
14,150
kWh
$557
-
kW-mo/yr
- - - - -
08 3.4151: Minimize water usage $1,375 $700 - - - $435
-
Tgal
$1,025
-
Tgal
- $(-85.0)
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,217 $46 $795
11,048
kWh
$422
-
kW-mo/yr
- - - - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $174 $221 $116
1,611
kWh
$58
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $95,745 $50,496 $67,466
936,913
kWh
$12,768
-
kW-mo/yr
$13,004
-
MMBtu
$435
-
Tgal
$1,025
-
Tgal
$8,400
-
gal
$(-7,353.0)
TOTAL IMPLEMENTED $12,964 $4,459 $4,694
65,206
kWh
$2,534
-
kW-mo/yr
$13,004
-
MMBtu
- - - $(-7,268.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs