ITAC Assessment: IP0187
ITAC logo
ITAC Assessment: IP0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastic Containers
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 250,000
ft2
Annual Production 14,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,401,671 140,448,596
kWh
Electricity Demand $13 1
kW-mo/yr
Electricity Fees $666 -
Natural Gas $46,446 17,986
MMBtu
TOTAL YEARLY COSTS $2,448,796
RECOMMENDED SAVINGS* $12,615 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,338 - $1,640
95,878
kWh
$1,698
-
kW-mo/yr
02 2.7135: Install occupancy sensors $242 $74 $119
6,938
kWh
$123
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,797 $42,271 $4,324
252,849
kWh
$4,473
-
kW-mo/yr
04 2.7492: Use proper thickness of insulation on building envelope $238 $1,514 $117
6,835
kWh
$121
-
kW-mo/yr
TOTAL RECOMMENDED $12,615 $43,859 $6,200
362,500
kWh
$6,415
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs