ITAC Assessment: WV0573
ITAC logo
ITAC Assessment: WV0573
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Glass display panels
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 90,000
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 2,500
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,084 1,846,290
kWh
Electricity Demand $125,662 7,110
kW-mo/yr
Electricity Fees $604 -
Natural Gas $70,480 9,137
MMBtu
TOTAL YEARLY COSTS $261,830
RECOMMENDED SAVINGS* $27,092 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,810

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1212: Operate boilers on high fire setting $14,618 $15,000 - - $14,618
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $7,189 $3,000 - - $7,209
-
MMBtu
$(-20.0)
03 2.7135: Install occupancy sensors $1,785 $3,399 $513
14,537
kWh
$1,272
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,129 $1,000 $1,129
31,974
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,078 $910 $318
9,008
kWh
$760
-
kW-mo/yr
- -
06 2.4224: Upgrade controls on compressors $535 $3,000 $535
15,142
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $523 $471 $223
6,307
kWh
$300
-
kW-mo/yr
- -
08 2.4151: Develop a repair/replace policy $120 $533 $103
2,911
kWh
$177
-
kW-mo/yr
- $(-160.0)
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $115 - $44
1,252
kWh
$71
-
kW-mo/yr
- -
TOTAL RECOMMENDED $27,092 $27,313 $2,865
81,131
kWh
$2,580
-
kW-mo/yr
$21,827
-
MMBtu
$(-180.0)
TOTAL IMPLEMENTED $10,810 $8,313 $1,201
34,015
kWh
$2,580
-
kW-mo/yr
$7,209
-
MMBtu
$(-180.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs