ITAC Assessment: WV0569
ITAC logo
ITAC Assessment: WV0569
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Steel
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 85,000
ft2
Annual Production 4,800
ton
Production Hrs. Annual 4,420
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,713 1,237,440
kWh
Electricity Demand $30,203 4,139
kW-mo/yr
Electricity Fees $9,767 -
Natural Gas $1,019 37
MMBtu
TOTAL YEARLY COSTS $128,702
RECOMMENDED SAVINGS* $88,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,713

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $40,139 $8,050 $137
1,931
kWh
- $2
-
MMBtu
- $40,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $18,808 $15,281 $14,136
199,374
kWh
$4,672
-
kW-mo/yr
- - -
03 2.4322: Use or replace with energy efficient substitutes $13,389 $48,000 $10,462
147,562
kWh
$2,927
-
kW-mo/yr
- - -
04 2.4224: Upgrade controls on compressors $5,281 $4,000 $5,281
74,481
kWh
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,167 $5,053 $5,167
72,886
kWh
- - - -
06 2.7241: Install outside air damper / economizer on hvac unit $2,755 $6,300 $1,339
18,882
kWh
$1,416
-
kW-mo/yr
- - -
07 2.6218: Turn off equipment when not in use $1,147 $188 $1,147
16,184
kWh
- - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $797 $25 $622
8,775
kWh
$175
-
kW-mo/yr
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $592 $427 $461
6,500
kWh
$131
-
kW-mo/yr
- - -
10 2.4151: Develop a repair/replace policy $369 $521 $445
6,271
kWh
$124
-
kW-mo/yr
- $(-200.0) -
TOTAL RECOMMENDED $88,444 $87,845 $39,197
552,846
kWh
$9,445
-
kW-mo/yr
$2
-
MMBtu
$(-200.0) $40,000
TOTAL IMPLEMENTED $21,713 $16,442 $16,811
237,104
kWh
$5,102
-
kW-mo/yr
- $(-200.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs