Assessment Year | 2018 |
---|---|
Principal Product | Steel |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 82 |
Plant Area |
85,000
ft2
|
Annual Production | 4,800
ton
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,713 | 1,237,440 |
kWh
|
$0.071 |
Electricity Demand | $30,203 | 4,139 |
kW-mo/yr
|
$7.30 |
Electricity Fees | $9,767 | - |
|
- |
Natural Gas | $1,019 | 37 |
MMBtu
|
$27.54 |
TOTAL YEARLY COSTS | $128,702 | |||
RECOMMENDED SAVINGS* | $88,444 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,713 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $40,139 | $8,050 |
$137
1,931
kWh
|
- |
$2
-
MMBtu
|
- | $40,000 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,808 | $15,281 |
$14,136
199,374
kWh
|
$4,672
-
kW-mo/yr
|
- | - | - | |
03 | 2.4322: Use or replace with energy efficient substitutes | $13,389 | $48,000 |
$10,462
147,562
kWh
|
$2,927
-
kW-mo/yr
|
- | - | - | |
04 | 2.4224: Upgrade controls on compressors | $5,281 | $4,000 |
$5,281
74,481
kWh
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,167 | $5,053 |
$5,167
72,886
kWh
|
- | - | - | - | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $2,755 | $6,300 |
$1,339
18,882
kWh
|
$1,416
-
kW-mo/yr
|
- | - | - | |
07 | 2.6218: Turn off equipment when not in use | $1,147 | $188 |
$1,147
16,184
kWh
|
- | - | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $797 | $25 |
$622
8,775
kWh
|
$175
-
kW-mo/yr
|
- | - | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $592 | $427 |
$461
6,500
kWh
|
$131
-
kW-mo/yr
|
- | - | - | |
10 | 2.4151: Develop a repair/replace policy | $369 | $521 |
$445
6,271
kWh
|
$124
-
kW-mo/yr
|
- | $(-200.0) | - | |
TOTAL RECOMMENDED | $88,444 | $87,845 |
$39,197
552,846
kWh
|
$9,445
-
kW-mo/yr
|
$2
-
MMBtu
|
$(-200.0) | $40,000 | ||
TOTAL IMPLEMENTED | $21,713 | $16,442 |
$16,811
237,104
kWh
|
$5,102
-
kW-mo/yr
|
- | $(-200.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs