ITAC Assessment: WV0564
ITAC logo
ITAC Assessment: WV0564
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 16
Plant Area 850,000
ft2
Annual Production 4,015,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $659,210 10,608,544
kWh
Electricity Fees $59,736 -
TOTAL YEARLY COSTS $718,946
RECOMMENDED SAVINGS* $168,565 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $159,352

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $138,212 $160,200 $138,212
2,225,641
kWh
- -
02 2.4157: Establish a predictive maintenance program $16,975 $1,000 $19,445
313,128
kWh
$(-2,470.0) -
03 2.4151: Develop a repair/replace policy $5,662 $533 $5,862
94,391
kWh
- $(-200.0)
04 2.4322: Use or replace with energy efficient substitutes $3,275 $4,000 $3,275
52,735
kWh
- -
05 2.7135: Install occupancy sensors $3,126 $2,051 $3,126
50,342
kWh
- -
06 2.4224: Upgrade controls on compressors $1,039 $4,000 $1,039
16,732
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $276 $785 $276
4,446
kWh
- -
TOTAL RECOMMENDED $168,565 $172,569 $171,235
2,757,415
kWh
$(-2,470.0) $(-200.0)
TOTAL IMPLEMENTED $159,352 $167,251 $161,822
2,605,843
kWh
$(-2,470.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs