| Assessment Year | 2018 | 
|---|---|
| Principal Product | Waste Water Treatment | 
| NAICS | 221320: Sewage Treatment Facilities | 
| SIC | 4952: Sewerage Systems | 
| Sales Range | $10 Mto 50 M | 
| # of Employees | 8 | 
| Plant Area | 280,000 
ft2
 | 
| Annual Production | 2,555,000 
Tgal
 | 
| Production Hrs. Annual | 8,760 
hrs
 | 
| Location (State) | Ohio | 
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $108,040 | 1,032,620 | 
kWh
 | $0.10 | 
| Electricity Demand | $15,183 | 3,322 | 
kW-mo/yr
 | $4.57 | 
| Electricity Fees | $432 | - |  | - | 
| Fuel Oil #2 | $10,240 | 569 | 
MMBtu
 | $18.00 | 
| TOTAL YEARLY COSTS | $133,895 | |||
| RECOMMENDED SAVINGS* | $47,084 | See individual recommendations below*Non-energy impacts included in savings. | ||
| IMPLEMENTED SAVINGS* | $35,409 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings | 
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,162 | $53,700 | $14,307 136,782
                                 
kWh
 | $855 -
                                 
kW-mo/yr
 | - | - | - | |
| 02 | 2.1332: Convert combustion equipment to burn natural gas | $10,502 | $18,000 | - | - | $(-2,738.0) -
                                 
MMBtu
 | $10,240 -
                                 
MMBtu
 | $3,000 | |
| 03 | 2.4313: Provide proper maintenance of motor driven equipment | $6,339 | $6,000 | $5,983 57,196
                                 
kWh
 | $356 -
                                 
kW-mo/yr
 | - | - | - | |
| 04 | 2.1336: Install equipment to utilize waste fuel | $5,001 | $25,000 | - | - | - | $5,001 -
                                 
MMBtu
 | - | |
| 05 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $2,502 | $7,080 | $1,999 19,109
                                 
kWh
 | $503 -
                                 
kW-mo/yr
 | - | - | - | |
| 06 | 2.4157: Establish a predictive maintenance program | $2,455 | $1,000 | $3,623 34,632
                                 
kWh
 | $215 -
                                 
kW-mo/yr
 | - | - | $(-1,383.0) | |
| 07 | 2.7131: Add area lighting switches | $2,327 | $4,400 | $2,194 20,971
                                 
kWh
 | $133 -
                                 
kW-mo/yr
 | - | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,289 | $3,732 | $2,120 20,269
                                 
kWh
 | $169 -
                                 
kW-mo/yr
 | - | - | - | |
| 09 | 2.4151: Develop a repair/replace policy | $507 | $638 | $666 6,366
                                 
kWh
 | $41 -
                                 
kW-mo/yr
 | - | - | $(-200.0) | |
| TOTAL RECOMMENDED | $47,084 | $119,550 | $30,892 295,325
                                 
kWh
 | $2,272 -
                                 
kW-mo/yr
 | $(-2,738.0) -
                                 
MMBtu
 | $15,241 -
                                 
MMBtu
 | $1,417 | ||
| TOTAL IMPLEMENTED | $35,409 | $101,432 | $20,050 191,683
                                 
kWh
 | $1,239 -
                                 
kW-mo/yr
 | $(-2,738.0) -
                                 
MMBtu
 | $15,241 -
                                 
MMBtu
 | $1,617 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs
             
             
             
            