Assessment Year | 2018 |
---|---|
Principal Product | Waste Water Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 8 |
Plant Area |
280,000
ft2
|
Annual Production | 2,555,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,040 | 1,032,620 |
kWh
|
$0.10 |
Electricity Demand | $15,183 | 3,322 |
kW-mo/yr
|
$4.57 |
Electricity Fees | $432 | - |
|
- |
Fuel Oil #2 | $10,240 | 569 |
MMBtu
|
$18.00 |
TOTAL YEARLY COSTS | $133,895 | |||
RECOMMENDED SAVINGS* | $47,084 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,409 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,162 | $53,700 |
$14,307
136,782
kWh
|
$855
-
kW-mo/yr
|
- | - | - | |
02 | 2.1332: Convert combustion equipment to burn natural gas | $10,502 | $18,000 | - | - |
$(-2,738.0)
-
MMBtu
|
$10,240
-
MMBtu
|
$3,000 | |
03 | 2.4313: Provide proper maintenance of motor driven equipment | $6,339 | $6,000 |
$5,983
57,196
kWh
|
$356
-
kW-mo/yr
|
- | - | - | |
04 | 2.1336: Install equipment to utilize waste fuel | $5,001 | $25,000 | - | - | - |
$5,001
-
MMBtu
|
- | |
05 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $2,502 | $7,080 |
$1,999
19,109
kWh
|
$503
-
kW-mo/yr
|
- | - | - | |
06 | 2.4157: Establish a predictive maintenance program | $2,455 | $1,000 |
$3,623
34,632
kWh
|
$215
-
kW-mo/yr
|
- | - | $(-1,383.0) | |
07 | 2.7131: Add area lighting switches | $2,327 | $4,400 |
$2,194
20,971
kWh
|
$133
-
kW-mo/yr
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,289 | $3,732 |
$2,120
20,269
kWh
|
$169
-
kW-mo/yr
|
- | - | - | |
09 | 2.4151: Develop a repair/replace policy | $507 | $638 |
$666
6,366
kWh
|
$41
-
kW-mo/yr
|
- | - | $(-200.0) | |
TOTAL RECOMMENDED | $47,084 | $119,550 |
$30,892
295,325
kWh
|
$2,272
-
kW-mo/yr
|
$(-2,738.0)
-
MMBtu
|
$15,241
-
MMBtu
|
$1,417 | ||
TOTAL IMPLEMENTED | $35,409 | $101,432 |
$20,050
191,683
kWh
|
$1,239
-
kW-mo/yr
|
$(-2,738.0)
-
MMBtu
|
$15,241
-
MMBtu
|
$1,617 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs