Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Waste Water Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 8
Plant Area 280,000
ft2
Annual Production 2,555,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,040 1,032,620
kWh
Electricity Demand $15,183 3,322
kW-mo/yr
Electricity Fees $432 -
Fuel Oil #2 $10,240 569
MMBtu
TOTAL YEARLY COSTS $133,895
RECOMMENDED SAVINGS* $47,084 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,409

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,162 $53,700 $14,307
136,782
kWh
$855
-
kW-mo/yr
- - -
02 2.1332: Convert combustion equipment to burn natural gas $10,502 $18,000 - - $(-2,738.0)
-
MMBtu
$10,240
-
MMBtu
$3,000
03 2.4313: Provide proper maintenance of motor driven equipment $6,339 $6,000 $5,983
57,196
kWh
$356
-
kW-mo/yr
- - -
04 2.1336: Install equipment to utilize waste fuel $5,001 $25,000 - - - $5,001
-
MMBtu
-
05 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $2,502 $7,080 $1,999
19,109
kWh
$503
-
kW-mo/yr
- - -
06 2.4157: Establish a predictive maintenance program $2,455 $1,000 $3,623
34,632
kWh
$215
-
kW-mo/yr
- - $(-1,383.0)
07 2.7131: Add area lighting switches $2,327 $4,400 $2,194
20,971
kWh
$133
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,289 $3,732 $2,120
20,269
kWh
$169
-
kW-mo/yr
- - -
09 2.4151: Develop a repair/replace policy $507 $638 $666
6,366
kWh
$41
-
kW-mo/yr
- - $(-200.0)
TOTAL RECOMMENDED $47,084 $119,550 $30,892
295,325
kWh
$2,272
-
kW-mo/yr
$(-2,738.0)
-
MMBtu
$15,241
-
MMBtu
$1,417
TOTAL IMPLEMENTED $35,409 $101,432 $20,050
191,683
kWh
$1,239
-
kW-mo/yr
$(-2,738.0)
-
MMBtu
$15,241
-
MMBtu
$1,617
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings