ITAC Assessment: WV0553
ITAC logo
ITAC Assessment: WV0553
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Hand Tools
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 14
Plant Area 900,000
ft2
Annual Production 25,550
units
Production Hrs. Annual 2,000
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,184 336,487
kWh
Electricity Demand $19,153 2,105
kW-mo/yr
Electricity Fees $252 -
Natural Gas $50,170 8,837
MMBtu
Other Gas $8,952 414
MMBtu
Waste Disposal Costs
Water Usage $96 18
Tgal
Water Disposal $162 18
Tgal
TOTAL YEARLY COSTS $103,969
RECOMMENDED SAVINGS* $35,797 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,408

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $23,992 $112,000 - - $23,992
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,431 $10,658 $3,138
41,953
kWh
$2,293
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,017 $210 $2,324
31,063
kWh
$1,693
-
kW-mo/yr
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,097 - $624
8,344
kWh
$473
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $496 $50 $287
3,843
kWh
$209
-
kW-mo/yr
- - - -
06 2.4224: Upgrade controls on compressors $397 $1,500 $397
5,302
kWh
- - - - -
07 3.4151: Minimize water usage $239 $1,050 - - - $96
-
Tgal
$162
-
Tgal
$(-19.0)
08 2.4151: Develop a repair/replace policy $128 $594 $160
2,134
kWh
$118
-
kW-mo/yr
- - - $(-150.0)
TOTAL RECOMMENDED $35,797 $126,062 $6,930
92,639
kWh
$4,786
-
kW-mo/yr
$23,992
-
MMBtu
$96
-
Tgal
$162
-
Tgal
$(-169.0)
TOTAL IMPLEMENTED $11,408 $12,562 $6,533
87,337
kWh
$4,786
-
kW-mo/yr
- $96
-
Tgal
$162
-
Tgal
$(-169.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs