ITAC Assessment: SF0297
ITAC logo
ITAC Assessment: SF0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Preserved Wood
NAICS 321114: Wood Preservation
SIC 2491: Wood Preserving
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 1,000,000
ft2
Annual Production 1,683
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,358 838,895
kWh
Electricity Demand $24,375 2,748
kW-mo/yr
Natural Gas $119,689 14,204
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,776 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,715

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,571 - $1,847
28,499
kWh
- - $(-276.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,017 $1,783 $856
13,208
kWh
$161
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $558 $553 $399
6,184
kWh
$159
-
kW-mo/yr
- -
04 2.1121: Use insulation in furnaces to facilitate heating / cooling $34,144 $50,073 - - $34,144
-
MMBtu
-
05 2.7111: Reduce illumination to minimum necessary levels $486 $1,243 $410
6,329
kWh
$76
-
kW-mo/yr
- -
TOTAL RECOMMENDED $37,776 $53,652 $3,512
54,220
kWh
$396
-
kW-mo/yr
$34,144
-
MMBtu
$(-276.0)
TOTAL IMPLEMENTED $35,715 $50,073 $1,847
28,499
kWh
- $34,144
-
MMBtu
$(-276.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs