ITAC Assessment: WM0076
ITAC logo
ITAC Assessment: WM0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product NA
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 8
Plant Area 65,000
ft2
Annual Production 14,000,000
Tgal
Production Hrs. Annual 8,600
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $817,888 13,488,823
kWh
Electricity Demand $271,883 21,960
kW-mo/yr
Electricity Fees $28,387 -
Natural Gas $87,828 16,587
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,361 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4131: Size electric motors for peak operating efficiency $37,683 $5,100 - $37,683
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $16,750 $9,000 $13,081
215,745
kWh
$3,669
-
kW-mo/yr
-
03 2.4224: Upgrade controls on compressors $4,570 $16,350 $4,570
75,370
kWh
- -
04 2.7135: Install occupancy sensors $3,296 $1,875 $857
14,134
kWh
$2,439
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,283 $800 $1,814
29,910
kWh
$470
-
kW-mo/yr
-
06 2.7491: Insulate glazing, walls, ceilings, and roofs $2,055 $1,000 - - $2,055
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $867 $3,330 $341
5,616
kWh
$526
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $627 $2,391 $627
10,337
kWh
- -
09 2.2511: Insulate bare equipment $230 $77 - - $230
-
MMBtu
TOTAL RECOMMENDED $68,361 $39,923 $21,289
351,112
kWh
$44,787
-
kW-mo/yr
$2,285
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs