Assessment Year | 1996 |
---|---|
Principal Product | Carpet Yarn |
NAICS |
n/a
|
SIC | 2261: Finishers of Broadwoven Fabrics of Cotton |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
100,000
ft2
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $693,607 | 27,415,299 |
kWh
|
$0.025 |
Electricity Demand | $490,398 | 45,591 |
kW-mo/yr
|
$10.76 |
Electricity Fees | $137,361 | - |
|
- |
Natural Gas | $212,869 | 58,745 |
MMBtu
|
$3.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $135,247 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $127,807 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,591 | $9,855 |
$864
34,291
kWh
|
$635
-
kW-mo/yr
|
$92 | - | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,700 | $1,263 |
$964
38,101
kWh
|
$686
-
kW-mo/yr
|
$50 | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $13,380 | - |
$7,587
299,824
kWh
|
$5,034
-
kW-mo/yr
|
$759 | - | - | - | |
04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $5,740 | $15,240 | - | - | - |
$5,740
-
MMBtu
|
- | - | |
05 | 2.2622: Replace existing chiller with high efficiency model | $112,836 | $405,000 |
$40,986
1,619,871
kWh
|
$63,450
-
kW-mo/yr
|
- | - |
$1,200
-
lb
|
$7,200 | |
TOTAL RECOMMENDED | $135,247 | $431,358 |
$50,401
1,992,087
kWh
|
$69,805
-
kW-mo/yr
|
$901 |
$5,740
-
MMBtu
|
$1,200
-
lb
|
$7,200 | ||
TOTAL IMPLEMENTED | $127,807 | $414,855 |
$49,437
1,953,986
kWh
|
$69,119
-
kW-mo/yr
|
$851 | - |
$1,200
-
lb
|
$7,200 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs