ITAC Assessment: GT0594
ITAC logo
ITAC Assessment: GT0594
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Carpet Yarn
NAICS
n/a
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 100,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $693,607 27,415,299
kWh
Electricity Demand $490,398 45,591
kW-mo/yr
Electricity Fees $137,361 -
Natural Gas $212,869 58,745
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $127,807

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $1,591 $9,855 $864
34,291
kWh
$635
-
kW-mo/yr
$92 - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,700 $1,263 $964
38,101
kWh
$686
-
kW-mo/yr
$50 - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $13,380 - $7,587
299,824
kWh
$5,034
-
kW-mo/yr
$759 - - -
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $5,740 $15,240 - - - $5,740
-
MMBtu
- -
05 2.2622: Replace existing chiller with high efficiency model $112,836 $405,000 $40,986
1,619,871
kWh
$63,450
-
kW-mo/yr
- - $1,200
-
lb
$7,200
TOTAL RECOMMENDED $135,247 $431,358 $50,401
1,992,087
kWh
$69,805
-
kW-mo/yr
$901 $5,740
-
MMBtu
$1,200
-
lb
$7,200
TOTAL IMPLEMENTED $127,807 $414,855 $49,437
1,953,986
kWh
$69,119
-
kW-mo/yr
$851 - $1,200
-
lb
$7,200
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs