ITAC Assessment: WV0548
ITAC logo
ITAC Assessment: WV0548
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product hardwood flooring
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 81
Plant Area 116,417
ft2
Annual Production 2,900
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,233 2,643,539
kWh
Electricity Demand $79,439 14,314
kW-mo/yr
Electricity Fees $3,362 -
Natural Gas $30,940 14,691
MMBtu
Waste Disposal Costs
Water Usage $1,218 71
Tgal
Water Disposal $3,463 71
Tgal
TOTAL YEARLY COSTS $321,655
RECOMMENDED SAVINGS* $48,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,388

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
01 2.7241: Install outside air damper / economizer on hvac unit $9,343 $2,478 - - $9,343
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,922 $41,392 $6,225
80,955
kWh
$2,697
-
kW-mo/yr
- - - -
03 4.642: Install sensors to detect and avoid jams $6,579 $1,611 $5,985
77,834
kWh
$594
-
kW-mo/yr
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,331 - $4,416
57,420
kWh
$1,915
-
kW-mo/yr
- - - -
05 3.4151: Minimize water usage $4,164 $750 - - - $1,218
-
Tgal
$3,463
-
Tgal
$(-517.0)
06 2.4157: Establish a predictive maintenance program $3,443 $1,000 $3,657
47,555
kWh
$1,582
-
kW-mo/yr
- - - $(-1,796.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,545 $8,388 $2,195
28,541
kWh
$350
-
kW-mo/yr
- - - -
08 2.4224: Upgrade controls on compressors $2,479 $10,000 $1,730
22,502
kWh
$749
-
kW-mo/yr
- - - -
09 2.7241: Install outside air damper / economizer on hvac unit $1,157 $3,278 $807
10,500
kWh
$350
-
kW-mo/yr
- - - -
10 2.4239: Eliminate or reduce compressed air usage $1,140 $1,058 $796
10,350
kWh
$344
-
kW-mo/yr
- - - -
11 2.4151: Develop a repair/replace policy $1,024 $699 $869
11,303
kWh
$377
-
kW-mo/yr
- - - $(-222.0)
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $863 $431 $602
7,833
kWh
$261
-
kW-mo/yr
- - - -
13 2.1233: Analyze flue gas for proper air/fuel ratio $260 $850 - - $260
-
MMBtu
- - -
TOTAL RECOMMENDED $48,250 $71,935 $27,282
354,793
kWh
$9,219
-
kW-mo/yr
$9,603
-
MMBtu
$1,218
-
Tgal
$3,463
-
Tgal
$(-2,535.0)
TOTAL IMPLEMENTED $23,388 $52,760 $17,964
233,607
kWh
$7,182
-
kW-mo/yr
$260
-
MMBtu
- - $(-2,018.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs