ITAC Assessment: WV0530
ITAC logo
ITAC Assessment: WV0530
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Vinyl Extrusion
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 154
Plant Area 196,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $996,946 24,572,128
kWh
Electricity Demand $640,270 55,575
kW-mo/yr
Electricity Fees $6,000 -
Natural Gas $6,393 990
MMBtu
TOTAL YEARLY COSTS $1,649,609
RECOMMENDED SAVINGS* $165,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $142,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2511: Insulate bare equipment $45,649 $8,838 $32,666
804,578
kWh
$12,983
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $44,558 $72,000 $31,886
785,367
kWh
$12,672
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $22,714 $16,453 $16,252
400,305
kWh
$6,462
-
kW-mo/yr
- -
04 2.4157: Establish a predictive maintenance program $15,987 $1,000 $14,719
362,534
kWh
$5,852
-
kW-mo/yr
- $(-4,584.0)
05 2.4151: Develop a repair/replace policy $8,519 $1,125 $6,369
156,866
kWh
$2,534
-
kW-mo/yr
- $(-384.0)
06 2.4231: Reduce the pressure of compressed air to the minimum required $8,493 $128 $6,074
149,602
kWh
$2,419
-
kW-mo/yr
- -
07 2.4224: Upgrade controls on compressors $6,845 $5,000 $4,898
120,647
kWh
$1,947
-
kW-mo/yr
- -
08 2.2437: Recover waste heat from equipment $6,395 $27,920 - - $6,395
-
MMBtu
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,409 $1,036 $3,153
77,659
kWh
$1,256
-
kW-mo/yr
- -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,195 $8,450 $1,573
38,745
kWh
$622
-
kW-mo/yr
- -
TOTAL RECOMMENDED $165,764 $141,950 $117,590
2,896,303
kWh
$46,747
-
kW-mo/yr
$6,395
-
MMBtu
$(-4,968.0)
TOTAL IMPLEMENTED $142,357 $112,777 $105,147
2,589,835
kWh
$41,794
-
kW-mo/yr
- $(-4,584.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs