Assessment Year | 2016 |
---|---|
Principal Product | Lumber |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 126 |
Plant Area |
40,000
ft2
|
Annual Production | 18,000
thousand feet
|
Production Hrs. Annual | 2,678
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $314,377 | 9,466,174 |
kWh
|
$0.033 |
Electricity Demand | $432,504 | 28,229 |
kW-mo/yr
|
$15.32 |
Wood | $91,250 | 58,400 |
MMBtu
|
$1.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,510 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,142 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1116: Improve combustion control capability | $22,825 | $54,000 | - | - |
$22,825
-
MMBtu
|
- | |
02 | 2.4157: Establish a predictive maintenance program | $7,474 | $1,000 |
$6,716
202,293
kWh
|
$4,351
-
kW-mo/yr
|
- | $(-3,593.0) | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $14,320 | - |
$4,668
140,589
kWh
|
$9,652
-
kW-mo/yr
|
- | - | |
04 | 2.4151: Develop a repair/replace policy | $5,859 | $1,478 |
$1,988
59,890
kWh
|
$4,351
-
kW-mo/yr
|
- | $(-480.0) | |
05 | 2.4224: Upgrade controls on compressors | $2,584 | $5,000 |
$2,584
77,845
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,573 | $450 |
$439
13,231
kWh
|
$1,134
-
kW-mo/yr
|
- | - | |
07 | 2.7135: Install occupancy sensors | $1,069 | $260 |
$1,069
33,207
kWh
|
- | - | - | |
08 | 2.2511: Insulate bare equipment | $959 | $1,940 | - | - |
$959
-
MMBtu
|
- | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $847 | $60 |
$265
7,984
kWh
|
$582
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $57,510 | $64,188 |
$17,729
535,039
kWh
|
$20,070
-
kW-mo/yr
|
$23,784
-
MMBtu
|
$(-4,073.0) | ||
TOTAL IMPLEMENTED | $31,142 | $3,248 |
$15,145
457,194
kWh
|
$20,070
-
kW-mo/yr
|
- | $(-4,073.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs