ITAC Assessment: SD0549
ITAC logo
ITAC Assessment: SD0549
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Optical surgery equipment
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 350
Plant Area 185,760
ft2
Annual Production 80,001
units
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $892,019 10,021,278
kWh
Electricity Demand $493,311 22,179
kW-mo/yr
Electricity Fees $10,638 -
Natural Gas $17,452 2,246
MMBtu
TOTAL YEARLY COSTS $1,413,420
RECOMMENDED SAVINGS* $68,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,390

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $49,288 $204,000 $36,724
412,620
kWh
$12,564
-
kW-mo/yr
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $16,056 $3,882 $14,772
165,524
kWh
$4,804
-
kW-mo/yr
$(-3,520.0)
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,048 $4,352 $529
5,940
kWh
$507
-
kW-mo/yr
- $1,012
04 2.4231: Reduce the pressure of compressed air to the minimum required $638 $600 $638
7,170
kWh
- - -
05 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $360 $300 $184
2,064
kWh
$176
-
kW-mo/yr
- -
TOTAL RECOMMENDED $68,390 $213,134 $52,847
593,318
kWh
$18,051
-
kW-mo/yr
$(-3,520.0)
-
MMBtu
$1,012
TOTAL IMPLEMENTED $68,390 $213,134 $52,847
593,318
kWh
$18,051
-
kW-mo/yr
$(-3,520.0)
-
MMBtu
$1,012
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs