Assessment Year | 2017 |
---|---|
Principal Product | Optical surgery equipment |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
Sales Range | less than $500 k |
# of Employees | 350 |
Plant Area |
185,760
ft2
|
Annual Production | 80,001
units
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $892,019 | 10,021,278 |
kWh
|
$0.089 |
Electricity Demand | $493,311 | 22,179 |
kW-mo/yr
|
$22.24 |
Electricity Fees | $10,638 | - |
|
- |
Natural Gas | $17,452 | 2,246 |
MMBtu
|
$7.77 |
TOTAL YEARLY COSTS | $1,413,420 | |||
RECOMMENDED SAVINGS* | $68,390 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $68,390 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $49,288 | $204,000 |
$36,724
412,620
kWh
|
$12,564
-
kW-mo/yr
|
- | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $16,056 | $3,882 |
$14,772
165,524
kWh
|
$4,804
-
kW-mo/yr
|
$(-3,520.0)
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,048 | $4,352 |
$529
5,940
kWh
|
$507
-
kW-mo/yr
|
- | $1,012 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $638 | $600 |
$638
7,170
kWh
|
- | - | - | |
05 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $360 | $300 |
$184
2,064
kWh
|
$176
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $68,390 | $213,134 |
$52,847
593,318
kWh
|
$18,051
-
kW-mo/yr
|
$(-3,520.0)
-
MMBtu
|
$1,012 | ||
TOTAL IMPLEMENTED | $68,390 | $213,134 |
$52,847
593,318
kWh
|
$18,051
-
kW-mo/yr
|
$(-3,520.0)
-
MMBtu
|
$1,012 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs