Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Stamping & Related Assemblies
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 355
Plant Area 210,000
ft2
Annual Production 73,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $452,083 7,783,200
kWh
Electricity Demand $121,971 13,821
kW-mo/yr
Natural Gas $136,596 18,870
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $144,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,359

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $34,159 $150,000 $26,194
450,846
kWh
$7,965
-
kW-mo/yr
- -
02 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $19,864 $40,000 $11,306
194,592
kWh
$4,909
-
kW-mo/yr
$3,649
-
MMBtu
-
03 2.4224: Upgrade controls on compressors $16,424 $20,442 $12,857
221,285
kWh
$3,567
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,254 $2,007 $12,171
209,477
kWh
$3,083
-
kW-mo/yr
- -
05 2.7314: Reduce ventilation air $14,480 $15,000 - - $14,480
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $13,417 $15,818 $8,366
143,989
kWh
$5,051
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,476 - $7,560
130,115
kWh
$1,916
-
kW-mo/yr
- -
08 3.5111: Filter and reuse hydraulic oil $9,274 $12,449 $(-185.0)
(-3,180)
kWh
$(-47.0)
-
kW-mo/yr
$9,506
-
MMBtu
-
09 2.2437: Recover waste heat from equipment $6,429 $15,050 - - $6,429
-
MMBtu
-
10 2.7221: Lower temperature during the winter season and vice-versa $3,475 $618 - - $3,475
-
MMBtu
-
11 2.4151: Develop a repair/replace policy $1,478 $677 $1,744
30,011
kWh
$442
-
kW-mo/yr
- $(-708.0)
12 2.4231: Reduce the pressure of compressed air to the minimum required $759 $30 $609
10,479
kWh
$150
-
kW-mo/yr
- -
13 2.4157: Establish a predictive maintenance program $500 $1,000 $1,674
28,810
kWh
$424
-
kW-mo/yr
- $(-1,598.0)
TOTAL RECOMMENDED $144,989 $273,091 $82,296
1,416,424
kWh
$27,460
-
kW-mo/yr
$37,539
-
MMBtu
$(-2,306.0)
TOTAL IMPLEMENTED $44,359 $20,150 $32,124
552,881
kWh
$11,066
-
kW-mo/yr
$3,475
-
MMBtu
$(-2,306.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs