ITAC Assessment: WV0505
ITAC logo
ITAC Assessment: WV0505
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Roofing Membranes
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area 100,000
ft2
Annual Production 21,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $360,041 4,604,014
kWh
Electricity Demand $76,836 9,875
kW-mo/yr
Natural Gas $155,183 28,313
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,693 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,703

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,298 $6,690 $15,334
196,089
kWh
$2,964
-
kW-mo/yr
- -
02 2.2414: Use waste heat from hot flue gases to preheat $10,729 $22,950 $(-164.0)
(-2,102)
kWh
$(-23.0)
-
kW-mo/yr
$10,916
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,348 $8,583 $8,189
104,716
kWh
$1,159
-
kW-mo/yr
- -
04 2.4157: Establish a predictive maintenance program $7,847 $1,000 $8,421
107,680
kWh
$1,198
-
kW-mo/yr
- $(-1,772.0)
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,847 $345 $4,244
54,267
kWh
$603
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $4,707 $1,730 - - $4,707
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,601 $1,700 - - $2,636
-
MMBtu
$(-35.0)
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,549 - $2,230
28,521
kWh
$319
-
kW-mo/yr
- -
09 2.6232: Install set-back timers $2,219 $1,175 - - $2,219
-
MMBtu
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $2,063 $35 $1,806
23,101
kWh
$257
-
kW-mo/yr
- -
11 2.4151: Develop a repair/replace policy $1,699 $672 $2,220
28,392
kWh
$319
-
kW-mo/yr
- $(-840.0)
12 2.4239: Eliminate or reduce compressed air usage $786 $179 $685
8,757
kWh
$101
-
kW-mo/yr
- -
TOTAL RECOMMENDED $67,693 $45,059 $42,965
549,421
kWh
$6,897
-
kW-mo/yr
$20,478
-
MMBtu
$(-2,647.0)
TOTAL IMPLEMENTED $46,703 $19,025 $40,214
514,245
kWh
$6,500
-
kW-mo/yr
$2,636
-
MMBtu
$(-2,647.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs