ITAC Assessment: OK0485
ITAC logo
ITAC Assessment: OK0485
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Printed Materials
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 47
Plant Area 45,000
ft2
Annual Production 2,300,000
lb
Production Hrs. Annual 4,810
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,853 1,018,464
kWh
Natural Gas $12,519 2,239
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,225

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,114 $23,322 $19,382
363,716
kWh
$(-9,268.0)
-
MMBtu
-
02 2.7241: Install outside air damper / economizer on hvac unit $1,827 $2,730 $1,827
34,291
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $428 $786 $428
7,913
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $131 $395 $131
2,345
kWh
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,970 $29,500 - - $6,970
-
lb
TOTAL RECOMMENDED $19,470 $56,733 $21,768
408,265
kWh
$(-9,268.0)
-
MMBtu
$6,970
-
lb
TOTAL IMPLEMENTED $9,225 $33,016 $2,255
42,204
kWh
- $6,970
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs