ITAC Assessment: WV0495
ITAC logo
ITAC Assessment: WV0495
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product forged and finished OEM components
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 270,000
ft2
Annual Production 3,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $641,084 7,285,642
kWh
Electricity Demand $130,650 19,742
kW-mo/yr
Natural Gas $1,864,852 344,487
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $283,654 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,004

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $193,883 $164,700 $(-558.0)
(-6,340)
kWh
- $194,441
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $51,326 $26,640 $(-2,412.0)
(-27,407)
kWh
- $53,738
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $11,441 $15,000 $(-131.0)
(-1,493)
kWh
- $11,572
-
MMBtu
04 2.6232: Install set-back timers $10,203 $4,200 - - $10,203
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,578 $7,154 $4,737
53,840
kWh
$841
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $5,177 $5,764 - - $5,177
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,890 $5,211 $3,307
37,589
kWh
$583
-
kW-mo/yr
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,156 $725 $1,871
21,261
kWh
$285
-
kW-mo/yr
-
TOTAL RECOMMENDED $283,654 $229,394 $6,814
77,450
kWh
$1,709
-
kW-mo/yr
$275,131
-
MMBtu
TOTAL IMPLEMENTED $27,004 $23,054 $9,915
112,690
kWh
$1,709
-
kW-mo/yr
$15,380
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs