Assessment Year | 2018 |
---|---|
Principal Product | Coatings |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
26,000
ft2
|
Annual Production | 400,000,000
units
|
Production Hrs. Annual | 5,202
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $188,512 | 2,390,069 |
kWh
|
$0.079 |
Electricity Demand | $119,402 | 5,553 |
kW-mo/yr
|
$21.50 |
Electricity Fees | $8,779 | - |
|
- |
Natural Gas | $30,963 | 4,184 |
MMBtu
|
$7.40 |
TOTAL YEARLY COSTS | $347,656 | |||
RECOMMENDED SAVINGS* | $30,511 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,511 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.3132: Recharge batteries on during off-peak demand periods | $14,519 | $67,626 |
$3,396
43,050
kWh
|
$11,123
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,784 | $5,838 |
$5,217
66,114
kWh
|
$3,476
-
kW-mo/yr
|
$91 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,330 | $10,000 |
$2,425
30,734
kWh
|
$1,905
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,699 | $900 |
$1,699
21,538
kWh
|
- | - | |
05 | 2.7134: Use photocell controls | $1,115 | $2,775 |
$1,115
14,136
kWh
|
- | - | |
06 | 2.7135: Install occupancy sensors | $64 | $63 |
$64
815
kWh
|
- | - | |
TOTAL RECOMMENDED | $30,511 | $87,202 |
$13,916
176,387
kWh
|
$16,504
-
kW-mo/yr
|
$91 | ||
TOTAL IMPLEMENTED | $30,511 | $87,202 |
$13,916
176,387
kWh
|
$16,504
-
kW-mo/yr
|
$91 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs