ITAC Assessment: WV0489
ITAC logo
ITAC Assessment: WV0489
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product metal stampings
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 70,000
ft2
Annual Production 2,000
ton
Production Hrs. Annual 4,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,167 1,485,960
kWh
Electricity Demand $98,302 5,240
kW-mo/yr
Natural Gas $9,365 1,223
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,014

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.8112: Combine utility meters $19,660 $10,500 - $19,660
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,418 $17,825 $8,418
140,278
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,336 - $2,785
46,408
kWh
$2,551
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,622 $6,539 $2,371
39,506
kWh
$2,251
-
kW-mo/yr
- -
05 2.6218: Turn off equipment when not in use $4,585 - $4,585
76,404
kWh
- - -
06 2.4157: Establish a predictive maintenance program $3,770 $1,000 $2,731
45,515
kWh
$2,514
-
kW-mo/yr
- $(-1,475.0)
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,213 $2,425 $1,675
27,905
kWh
$1,538
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,258 $271 $658
10,957
kWh
$600
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $965 $620 $534
8,892
kWh
$431
-
kW-mo/yr
- -
10 2.6232: Install set-back timers $812 $1,375 - - $812
-
MMBtu
-
11 2.4151: Develop a repair/replace policy $564 $443 $414
6,904
kWh
$375
-
kW-mo/yr
- $(-225.0)
TOTAL RECOMMENDED $53,203 $40,998 $24,171
402,769
kWh
$29,920
-
kW-mo/yr
$812
-
MMBtu
$(-1,700.0)
TOTAL IMPLEMENTED $19,014 $9,235 $12,074
201,180
kWh
$6,940
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs