Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Custom Extrusion
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 90,000
ft2
Annual Production 300,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,258 1,067,040
kWh
Electricity Demand $21,109 3,186
kW-mo/yr
Natural Gas $17,157 2,226
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,426

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,665 $9,243 $3,657
45,767
kWh
$1,008
-
kW-mo/yr
- -
02 2.7231: Use radiant heater for spot heating $2,722 $6,898 - - $2,722
-
MMBtu
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,735 $214 - - $1,735
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,681 $1,893 $1,449
18,131
kWh
$232
-
kW-mo/yr
- -
05 2.3191: Use demand controller or load shedder $1,558 $4,320 - $1,558
-
kW-mo/yr
- -
06 2.2437: Recover waste heat from equipment $1,203 $1,160 - - $1,203
-
MMBtu
-
07 2.4157: Establish a predictive maintenance program $1,003 $1,000 $1,787
22,364
kWh
$285
-
kW-mo/yr
- $(-1,069.0)
08 2.4231: Reduce the pressure of compressed air to the minimum required $901 $16 $775
9,701
kWh
$126
-
kW-mo/yr
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $571 $120 $491
6,145
kWh
$80
-
kW-mo/yr
- -
10 2.4239: Eliminate or reduce compressed air usage $444 $320 $384
4,809
kWh
$60
-
kW-mo/yr
- -
11 2.4151: Develop a repair/replace policy $327 $221 $322
4,026
kWh
$53
-
kW-mo/yr
- $(-48.0)
12 2.4239: Eliminate or reduce compressed air usage $134 $150 $114
1,430
kWh
$20
-
kW-mo/yr
- -
TOTAL RECOMMENDED $16,944 $25,555 $8,979
112,373
kWh
$3,422
-
kW-mo/yr
$5,660
-
MMBtu
$(-1,117.0)
TOTAL IMPLEMENTED $10,426 $13,011 $8,090
101,242
kWh
$1,718
-
kW-mo/yr
$1,735
-
MMBtu
$(-1,117.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs