ITAC Assessment: WV0484
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product lift trucks
NAICS 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 840
pieces
Production Hrs. Annual 7,280
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $385,709 7,777,200
kWh
Electricity Demand $153,150 15,315
kW-mo/yr
Natural Gas $230,616 55,570
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,672 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $38,596 $58,450 $28,966
584,002
kWh
$9,630
-
kW-mo/yr
-
02 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $24,659 $51,000 - - $24,659
-
MMBtu
03 2.4224: Upgrade controls on compressors $11,868 $7,750 $8,648
174,355
kWh
$3,220
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $6,987 $3,690 $(-481.0)
(-9,703)
kWh
$(-230.0)
-
kW-mo/yr
$7,698
-
MMBtu
05 2.3191: Use demand controller or load shedder $6,830 $5,600 - $6,830
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $4,252 $4,500 $3,192
64,350
kWh
$1,060
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,693 $468 $2,023
40,786
kWh
$670
-
kW-mo/yr
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,298 - $1,728
34,836
kWh
$570
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,489 $6,113 $949
19,133
kWh
$540
-
kW-mo/yr
-
TOTAL RECOMMENDED $99,672 $137,571 $45,025
907,759
kWh
$22,290
-
kW-mo/yr
$32,357
-
MMBtu
TOTAL IMPLEMENTED $22,600 $18,831 $16,540
333,460
kWh
$6,060
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs