Assessment Year | 2014 |
---|---|
Principal Product | lift trucks |
NAICS | 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
150,000
ft2
|
Annual Production | 840
pieces
|
Production Hrs. Annual | 7,280
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $385,709 | 7,777,200 |
kWh
|
$0.050 |
Electricity Demand | $153,150 | 15,315 |
kW-mo/yr
|
$10.00 |
Natural Gas | $230,616 | 55,570 |
MMBtu
|
$4.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $99,672 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,600 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38,596 | $58,450 |
$28,966
584,002
kWh
|
$9,630
-
kW-mo/yr
|
- | |
02 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $24,659 | $51,000 | - | - |
$24,659
-
MMBtu
|
|
03 | 2.4224: Upgrade controls on compressors | $11,868 | $7,750 |
$8,648
174,355
kWh
|
$3,220
-
kW-mo/yr
|
- | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,987 | $3,690 |
$(-481.0)
(-9,703)
kWh
|
$(-230.0)
-
kW-mo/yr
|
$7,698
-
MMBtu
|
|
05 | 2.3191: Use demand controller or load shedder | $6,830 | $5,600 | - |
$6,830
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $4,252 | $4,500 |
$3,192
64,350
kWh
|
$1,060
-
kW-mo/yr
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,693 | $468 |
$2,023
40,786
kWh
|
$670
-
kW-mo/yr
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,298 | - |
$1,728
34,836
kWh
|
$570
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,489 | $6,113 |
$949
19,133
kWh
|
$540
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $99,672 | $137,571 |
$45,025
907,759
kWh
|
$22,290
-
kW-mo/yr
|
$32,357
-
MMBtu
|
||
TOTAL IMPLEMENTED | $22,600 | $18,831 |
$16,540
333,460
kWh
|
$6,060
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs