Assessment Year | 2014 |
---|---|
Principal Product | Hard Cover Trade Books |
NAICS | 323117: Books Printing |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 349 |
Plant Area |
337,000
ft2
|
Annual Production | 41,475,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $677,012 | 18,049,308 |
kWh
|
$0.038 |
Electricity Demand | $437,086 | 27,592 |
kW-mo/yr
|
$15.84 |
Natural Gas | $265,818 | 47,934 |
MMBtu
|
$5.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $124,632 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $88,799 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $21,169 | - |
$13,297
354,594
kWh
|
$7,872
-
kW-mo/yr
|
- | - | - | |
02 | 2.4157: Establish a predictive maintenance program | $21,019 | $1,000 |
$14,182
378,197
kWh
|
$8,395
-
kW-mo/yr
|
- | - | $(-1,558.0) | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,155 | $29,853 |
$12,663
337,691
kWh
|
$7,492
-
kW-mo/yr
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,660 | $27,648 |
$17,660
470,935
kWh
|
- | - | - | - | |
05 | 2.3212: Optimize plant power factor | $12,751 | $28,500 | - | - | $12,751 | - | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,328 | $1,700 | - | - | - |
$6,421
-
MMBtu
|
$(-93.0) | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,562 | $3,000 |
$2,867
76,701
kWh
|
$1,695
-
kW-mo/yr
|
- | - | - | |
08 | 2.4151: Develop a repair/replace policy | $4,319 | $667 |
$3,301
88,029
kWh
|
$1,948
-
kW-mo/yr
|
- | - | $(-930.0) | |
09 | 2.4224: Upgrade controls on compressors | $4,039 | $8,000 |
$3,349
89,304
kWh
|
$690
-
kW-mo/yr
|
- | - | - | |
10 | 2.7135: Install occupancy sensors | $3,548 | $792 |
$2,233
59,547
kWh
|
$1,315
-
kW-mo/yr
|
- | - | - | |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,819 | $155 |
$1,774
47,296
kWh
|
$1,045
-
kW-mo/yr
|
- | - | - | |
12 | 2.2414: Use waste heat from hot flue gases to preheat | $2,692 | $4,440 | - | - | - |
$2,692
-
MMBtu
|
- | |
13 | 2.7241: Install outside air damper / economizer on hvac unit | $1,789 | $722 |
$1,789
47,712
kWh
|
- | - | - | - | |
14 | 2.2113: Repair or replace steam traps | $841 | $2,878 | - | - | - |
$944
-
MMBtu
|
$(-103.0) | |
15 | 2.4239: Eliminate or reduce compressed air usage | $758 | $1,129 |
$473
12,614
kWh
|
$285
-
kW-mo/yr
|
- | - | - | |
16 | 2.2511: Insulate bare equipment | $183 | $181 | - | - | - |
$183
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $124,632 | $110,665 |
$73,588
1,962,620
kWh
|
$30,737
-
kW-mo/yr
|
$12,751 |
$10,240
-
MMBtu
|
$(-2,684.0) | ||
TOTAL IMPLEMENTED | $88,799 | $48,045 |
$53,666
1,431,359
kWh
|
$30,452
-
kW-mo/yr
|
- |
$7,365
-
MMBtu
|
$(-2,684.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs