Assessment Year | 2013 |
---|---|
Principal Product | custom rubber molded products |
NAICS | 326291: Rubber Product Manufacturing for Mechanical Use |
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $5 M to 10M |
# of Employees | 40 |
Plant Area |
26,000
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $157,498 | 2,112,720 |
kWh
|
$0.075 |
Electricity Demand | $36,621 | 6,293 |
kW-mo/yr
|
$5.82 |
Natural Gas | $4,693 | 572 |
MMBtu
|
$8.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,513 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,726 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $3,015 | $2,013 |
$2,619
35,160
kWh
|
$396
-
kW-mo/yr
|
- | - | |
02 | 2.3191: Use demand controller or load shedder | $2,823 | $6,345 | - |
$2,823
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,064 | $3,573 |
$1,796
24,108
kWh
|
$268
-
kW-mo/yr
|
- | - | |
04 | 2.4157: Establish a predictive maintenance program | $1,996 | $1,000 |
$2,686
36,058
kWh
|
$402
-
kW-mo/yr
|
- | $(-1,092.0) | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $647 | $1,581 |
$583
7,831
kWh
|
$64
-
kW-mo/yr
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $595 | $257 |
$519
6,964
kWh
|
$76
-
kW-mo/yr
|
- | - | |
07 | 2.4151: Develop a repair/replace policy | $490 | $1,035 |
$604
8,113
kWh
|
$93
-
kW-mo/yr
|
- | $(-207.0) | |
08 | 2.7135: Install occupancy sensors | $366 | $135 |
$319
4,280
kWh
|
$47
-
kW-mo/yr
|
- | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $260 | $137 |
$225
3,026
kWh
|
$35
-
kW-mo/yr
|
- | - | |
10 | 2.7261: Install timers and/or thermostats | $257 | $586 | - | - |
$257
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $12,513 | $16,662 |
$9,351
125,540
kWh
|
$4,204
-
kW-mo/yr
|
$257
-
MMBtu
|
$(-1,299.0) | ||
TOTAL IMPLEMENTED | $4,726 | $3,577 |
$4,286
57,543
kWh
|
$647
-
kW-mo/yr
|
- | $(-207.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs