Assessment Year | 2013 |
---|---|
Principal Product | steel pipe fittings |
NAICS | 332996: Fabricated Pipe and Pipe Fitting Manufacturing |
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
185,000
ft2
|
Annual Production | 750,000
ton
|
Production Hrs. Annual | 6,656
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $239,477 | 3,336,900 |
kWh
|
$0.072 |
Electricity Demand | $106,913 | 9,843 |
kW-mo/yr
|
$10.86 |
Natural Gas | $38,454 | 6,026 |
MMBtu
|
$6.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,175 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,842 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $21,317 | $6,300 | - | - | $21,317 | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $11,090 | $1,989 |
$8,386
116,848
kWh
|
$2,704
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,896 | $10,694 |
$8,724
121,561
kWh
|
$2,172
-
kW-mo/yr
|
- | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,996 | - |
$6,280
87,497
kWh
|
$1,716
-
kW-mo/yr
|
- | - | - | |
05 | 2.3191: Use demand controller or load shedder | $6,853 | $5,700 | - |
$6,853
-
kW-mo/yr
|
- | - | - | |
06 | 2.4157: Establish a predictive maintenance program | $5,514 | $1,000 |
$5,399
75,229
kWh
|
$1,477
-
kW-mo/yr
|
- | - | $(-1,362.0) | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,550 | $4,036 |
$3,638
50,690
kWh
|
$912
-
kW-mo/yr
|
- | - | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $2,484 | $2,292 |
$1,952
27,196
kWh
|
$532
-
kW-mo/yr
|
- | - | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,378 | $70 |
$1,085
15,118
kWh
|
$293
-
kW-mo/yr
|
- | - | - | |
10 | 2.7243: Improve air circulation with destratification fans / other methods | $706 | $460 |
$(-42.0)
(-579)
kWh
|
$(-11.0)
-
kW-mo/yr
|
- |
$759
-
MMBtu
|
- | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $314 | $56 |
$249
3,476
kWh
|
$65
-
kW-mo/yr
|
- | - | - | |
12 | 2.4151: Develop a repair/replace policy | $77 | $281 |
$222
3,092
kWh
|
$65
-
kW-mo/yr
|
- | - | $(-210.0) | |
TOTAL RECOMMENDED | $73,175 | $32,878 |
$35,893
500,128
kWh
|
$16,778
-
kW-mo/yr
|
$21,317 |
$759
-
MMBtu
|
$(-1,572.0) | ||
TOTAL IMPLEMENTED | $30,842 | $7,151 |
$25,037
348,858
kWh
|
$7,167
-
kW-mo/yr
|
- | - | $(-1,362.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |