ITAC Assessment: WV0467
ITAC logo
ITAC Assessment: WV0467
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Flyers, Flyers & Custom mail
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 115,000
ft2
Annual Production 30,000,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,102,018 18,473,013
kWh
Electricity Demand $298,345 37,380
kW-mo/yr
Natural Gas $337,918 62,642
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,206 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,665

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4224: Upgrade controls on compressors $26,386 $31,000 $22,302
373,566
kWh
$4,084
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,885 - $21,039
352,411
kWh
$3,846
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $14,786 $2,550 $12,496
209,320
kWh
$2,290
-
kW-mo/yr
- -
04 2.2414: Use waste heat from hot flue gases to preheat $12,526 $21,000 - - $12,526
-
MMBtu
-
05 2.4157: Establish a predictive maintenance program $9,901 $1,000 $11,262
188,646
kWh
$2,059
-
kW-mo/yr
- $(-3,420.0)
06 2.1233: Analyze flue gas for proper air/fuel ratio $7,844 $500 - - $8,317
-
MMBtu
$(-473.0)
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,668 $16,750 $6,479
108,529
kWh
$1,189
-
kW-mo/yr
- -
08 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $5,230 $3,625 $4,416
74,726
kWh
$814
-
kW-mo/yr
- -
09 2.1221: Replace obsolete burners with more efficient ones $2,986 $9,400 - - $2,986
-
MMBtu
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,815 $248 $2,376
39,798
kWh
$439
-
kW-mo/yr
- -
11 2.7447: Install vinyl strip / high speed / air curtain doors $2,059 $571 - - $2,059
-
MMBtu
-
12 2.4231: Reduce the pressure of compressed air to the minimum required $1,260 $45 $1,068
17,884
kWh
$192
-
kW-mo/yr
- -
13 2.4151: Develop a repair/replace policy $534 $826 $676
11,319
kWh
$128
-
kW-mo/yr
- $(-270.0)
14 2.7243: Improve air circulation with destratification fans / other methods $326 $810 $(-68.0)
(-1,144)
kWh
$(-16.0)
-
kW-mo/yr
$410
-
MMBtu
-
TOTAL RECOMMENDED $119,206 $88,325 $82,046
1,375,055
kWh
$15,025
-
kW-mo/yr
$26,298
-
MMBtu
$(-4,163.0)
TOTAL IMPLEMENTED $38,665 $4,914 $27,202
455,648
kWh
$4,980
-
kW-mo/yr
$10,376
-
MMBtu
$(-3,893.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings